My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20B - AA - AGMT - BOARD-UP SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
06/16/2015
>
20B - AA - AGMT - BOARD-UP SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 3:50:22 PM
Creation date
6/11/2015 2:59:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
20B
Date
6/16/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IWN01i:11ra <br />A I A 1' {,[) 1'66 11 AOII 110 N.S. 1\( , <br />S1)1ufio,t 1;'s e 11 au r,! <br />Section VI - Rate and Service Structure <br />Description <br />Amount <br />Section VI 4 a. Board -up cost of 1st standard window, flat rate for materials and on site labor only. <br />$90,00 <br />Section VI (1) Each additional window thereafter, flat rate for materials and on site labor only. <br />$75.00 <br />Section VI 4 b. Board -up cost of 1st single door opening, flat rate for materials and on site labor only. <br />$100.00 <br />Section VI (1) Each additional door thereafter, flat rate for materials and on site labor only, <br />$75.00 <br />Section VI 4 c. Board -up cost of garage doors (assumes a roll up door for a double car garage opening or <br />two single door side by side), Includes 4 sheets of OSB, necessary screws and /or nails, 6 - 2 x 4' and ram <br />sets. This is a flat rate for materials and on site labor only. <br />$210.00 <br />Section VI 4 c. 1. Board -up cost of a garage door (assumes a roll up door for a single car garage opening). <br />Includes 2 sheets of OSB, necessary screws and /or nails, 4 - 2 x 4' and ram sets. This is a flat rate for <br />materials and on site labor only, <br />$115.00 <br />_ _ <br />Section VI 4 d. Bolt, screw door, garages and windows, flat rate for materials and on site labor only. <br />$60.00 <br />Section VI 4 e. Chain and lock fee (includes 1 master lock H8 hardness, 1 YA" shackle, and 3' of 5/16" <br />galvanized chain) installed, flat rate for materials and on site labor only. <br />$1.15,00 <br />Section VI 4 f. Travel charges, per hour, <br />$95.00 <br />Sections VI 4 g. After -hour charge, per hour. <br />$120.00 <br />Non- colhrsion clause <br />The signer, of the RFP declares in this wilting that the only person, persons, company or parties interested <br />in the proposal as principals are named herein; that this proposal was made without collusion with any <br />other person, persons, company or- parities submitting a proposal; that it is in all respects fair and in good <br />faith without collusion or fraud; and, that the signer of this proposal has full authority to bind the principal <br />proposer. <br />Thank you for the opportunity, <br />Paul B. Strader <br />CA contractor's license B and C -21 1003099 <br />i-IAZWOPER certificate #34455 <br />Lead Safety RRP certificate R_I- 19157 -11 -00225 <br />91'7( I'1,l %i \l I IA i ); {!f 11.r ief,. 1 ( \(I iRRi\ ,_r 1'1, ,-111 <br />nuf,y1irtrnrlrrrVyn l2QR-•5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.