My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - WATER MAIN IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
06/16/2015
>
23A - PROJ - WATER MAIN IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 3:50:00 PM
Creation date
6/11/2015 3:30:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
6/16/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Answer:. <br />a) No, the bid items do not include the construction of the 5 -Inch thick PCC Pavement for <br />water line trenches. The final PCC paving of the water trenches is included in the bid <br />Kern #S of the proposal. <br />b) No, these areas are localized areas on the same street, but are not part of the water <br />main construction. <br />All other terms and conditions remain the same. <br />FOR THE CITY OF SANTA ANA <br />n��—Z <br />^'Edwin " r" Gal . <br />City EruinI eer am <br />BANTAANA CITY COUNCIL, <br />M(god A, Pukl 8017jtrrylnm I WMD1 F. Bg hnlo ; Mla*MM10a AngdlWA MM. P. BOVId Benavidpa i RtlMMRtlynq <br />INayor Mayor PraTem,N7aM5 Werd1 Word £ WRM$ �'/,M4 Wan'19 <br />i1y?y7gl,�anla -n ie,1n 19T no�eruYttlatlntwatBOm � - i iva ee„�ta�engorR � er �pgpla;,gp@,,p(C ud se 1 p,,p{y � OHn odCes o Iq.nie. i R�1'gv e?nsenle -aps orcl <br />23A -14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.