My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - WATER MAIN IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
06/16/2015
>
23A - PROJ - WATER MAIN IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 3:50:00 PM
Creation date
6/11/2015 3:30:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
6/16/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />CONSTRUCTION CONTRACT <br />PROJECT NO. 15.6836: RESIDENTIAL STREET REPAIR FY 14J15 <br />PROJECT 15.6452: WILSHIRE AVE. AND 60RCHARD AVE. WATER MAIN IMPROVEMENTS <br />This CONSTRUCTION CONTRACT is made and entered into this 16 day of June 2015, by and <br />between the CITY OF SANTA ANA, CALIFORNIA, a charter city and municipal corporation <br />organized and existing under the Constitution and laws of the State of California, hereinafter <br />referred to as "CITY" and Excel Paving Company, hereinafter referred to as "CON'T'RACTOR'. <br />WPCNE,SSETH: <br />The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as <br />follows: <br />1. CONTRAC'T'OR. agrees to perform all the work and furnish all the materials at its own cost <br />and expense necessary to construct and complete in a good and workmanlike manner and to <br />the satisfaction of the City Engineer of the CITY, the Project No, 15 -6836: Residential Street <br />Repair FY 14/15 and Project 15 -6452; Wilshire Ave. and Borchard Ave. Water Main <br />Improvements identified in and in accordance with the Contract Documents prepared by the <br />City's Public Works Agency and approved by the City Council. <br />2. The complete Construction Contract consists of file "Contract Documents," as defined by the <br />Standard Specifications for Public Works Construction and which include the following: <br />•... Notice Inviting Bids <br />• ... Instructions to Bidders <br />•... Bid Proposal <br />• ... Bid Bond <br />Contract Forms <br />•... Contract ponds <br />•... General Provisions <br />•... Special Provisions <br />•.., Technical Provisions <br />Project Plans <br />• ,.. Appendices <br />In case of conflict between the Contract Documents, the precedence of documents shall be as <br />established in the Standard Specifications for Public Works Consnuction. <br />CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete <br />Project No. 1.5 -6836: Residential Street Repair FY 14/15 and Project 15 -6452: 'Wilshire Ave. <br />and Borchard Ave. Water Main Improvements the sum total amount not to exceed <br />$2,715,286.20, as set forth and identified in the BID PROPOSAL, which is attached hereto <br />and incorporated herein as Exhibit "A ". The BID PROPOSAL contains a schedule of unit <br />prices) or lump sum(s) based on approximate quluuities only, and the City does riot <br />Page '1 o1`3 <br />Wki� 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.