My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A-2 - PH - MISC FEES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
06/16/2015
>
75A-2 - PH - MISC FEES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2015 2:50:30 PM
Creation date
6/12/2015 2:48:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
75A-2
Date
6/16/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2015-### <br />2.4% <br />PROPOSED <br />REVENUE <br />FY 14-15 <br />FY 15-16 <br />ACCOUNT <br />DEPARTMENTAIISCELLe1_NEOUS FEE OR SERVICE <br />UNIT <br />FEES <br />FEES <br />SECTIO\ IN <br />PLANNING & BUILDING AGENCY <br />51604 <br />MECHANICAL CODE <br />Anyperson desiring opermit required by the Mechanical <br />Each Permit <br />$40.79 <br />$41.77 <br />Code shall, at the time of filing an application, pay a fee <br />of $40.79. There is no minimum fee for the issuance of a <br />permit for single family residences and duplexes. The <br />minimum total fee for issuance of a permit for all other uses <br />shall be $66.65. <br />$66.65 <br />$68.25 <br />FEESCHEDULE <br />51604 <br />1) For the installation or relocation of each forced -air or <br />Each <br />$29.76 <br />$30.47 <br />gravity -type furnace or burner, including ducts and <br />vents attached to such appliance, up to and including <br />100,000 BTU/h <br />51604 <br />2) For the installation or relocation of each forced -air <br />Each <br />$42.50 <br />$43.52 <br />or gravity -type furnace or burner, including ducts <br />and vents attached to such appliance over 100.000 BTU/h <br />51604 <br />3) For the installation or relocation of each boiler, compressor, <br />Each <br />$51.40 <br />$52.63 <br />condensing unit or heat pump up to and including five <br />horsepower, or each absorption system to and including <br />100,000 BTU/h <br />51604 <br />4) For the installation or relocation of each boiler. <br />Each <br />$51.40 <br />$52.63 <br />compressor, condensing unit or heatpump over five <br />horsepower up to and including 30 horsepower or <br />for each absorption system over 100.000 BTU/h up <br />to and including 1.000.000 BTU/h <br />51604 <br />5) For the installation, relocation of each boiler, compressor. <br />Each <br />$62.39 <br />$63.89 <br />condensing unit or heat pump over 29 horsepower up to and <br />including 50 horsepower or for each absorption system over <br />1.000.000 BTU/h up to and including 1.750.000 BTU/h <br />51604 <br />6) For the installation or relocation of each boiler, compressor, <br />Each <br />$85.31 <br />$87.36 <br />condensing unit or heat pump over 49 horsepower, or each <br />absorption system over 1.750.000 BTU/h <br />51604 <br />7) For each VAV control box or air handling <br />Each <br />$20.20 <br />$20.69 <br />unit to and including 2.000 cubic feet per minute, <br />including ducts attached thereto <br />75A72-65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.