My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2015-06-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
06/16/2015
>
FULL PACKET_2015-06-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2015 3:11:17 PM
Creation date
6/12/2015 2:55:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/16/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
750
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM NO. ONE <br />PROJECT NO. 15-6836 AND 15-6492 <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 15-6836: RESIDENTIAL STREET REPAIR FY 14/15 <br />PROJECT 15-6452: WILSHIRE AVE. AND BORCHARD AVE. WATER MAIN IMPROVEMENTS <br />Item <br />Description <br />Quantities <br />Unit <br />Unit Price <br />Amount <br />30 <br />Traffic Loop Detector <br />3 <br />EA <br />I <br />2►� - <br />31 <br />18" — #3 dowels (with epoxy grouted)* <br />12,000 <br />EA <br />V VV d <br />TOTAL BASE BID <br />The lowest BIDDER shall be selected on based on the lowest responsible total bid. The City <br />reserves the right to award the Base Bid, and any, all, or none of the add -alternate bid items (if <br />any). <br />The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The <br />actual amount for this item will be dictated by the actual quantity used, and the Agency <br />reserves the right to increase or decrease the quantity of this item accordingly. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above within seventy 70 working days after the commencement date stated in the <br />Notice to Proceed. Furthermore, Project 15-6452 Water Main improvements shall be <br />completed within the first 30 working days and Project 15-6836 may start at the same time as <br />water main improvement, except on Wilshire Avenue and Borchard Avenue. The bidder also <br />proposes to commence construction of the Work within ten (10) days after issuance of a Notice <br />to Proceed, and to continue in a diligent and workman -like manner without interruption, and to <br />complete the construction thereof within the time specified above. <br />The liquidated damages amount in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications shall be $4,400 per calendar day if not completed within the first 30 <br />working days for Project 15-64-52 and $4,400 per calendar day if not completed within 70 <br />working days for Project 15-6836. <br />P", INCABA <br />Name of Firm Exce, piilyi; ) (o NMAW <br />Signature of BIDDER <br />Title i?. BROWN, f RE51DENT <br />(if an individual, so state) <br />BP -3 of 17 <br />23A-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.