My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (5)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:00:00 PM
Creation date
6/15/2015 3:44:47 PM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA PROFESSIONAL ENGINEERING, INC.
Contract #
Various
Agency
Public Works
Council Approval Date
3/17/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. If PROJECT is not on STATE. -awned right of way, PROJECT shall be designed <br />and constructed in accordance with Chapter 1000, Bikeway Planning and Design of the <br />Highway Design Manual that describes minimum statewide design standards for <br />bikeways and roads where bicycle travel is permitted and the California Manual on <br />Uniform Traffic Control Devices that describes the uniform standards and specifications <br />for all official traffic control devices. <br />5. If PROJECT involves work within or partially within STATE -owned right of <br />way, that PROJECT shall also be subject to compliance with the policies, procedures and <br />standards of the STATE Project Development Procedures Manual, Highway Design <br />Manual, and California Manual on Uniform Traffic Control Devices and where <br />appropriate, an executed cooperative agreement between STATE and LOCAL AGENCY <br />that outlines the PROJECT responsibilities and respective obligations of the PARTIES. <br />LOCAL AGENCY and its contractors shall each obtain an encroachment permit through <br />STATE prior to commencing any work within STATE right of way or work which <br />affects STATE facilities. <br />ARTICLE III - Engineering <br />1. LOCAL AGENCY eligible costs for preliminary engineering work includes all <br />preliminary work directly related to PROJECT up to contract award for construction, <br />including, but not limited to, preliminary surveys and reports, laboratory work, soil <br />investigations, the preparation of plans, specifications and estimates (PS&E), advertising <br />for bids, awarding of a contract and project development contract administration. <br />2. LOCAL AGENCY eligible costs for construction engineering includes actual <br />inspection and supervision of PROJECT construction work; construction staking; <br />laboratory and field testing; and the preparation and processing of field reports, records, <br />estimates, final reports, and allowable expenses of employees/consultants engaged in <br />such activities. <br />3. Preliminary and construction engineering costs included in the estimate contained <br />in Exhibit A are eligible project costs. STATE reimbursement to LOCAL AGENCY will <br />be on the basis of the actual cost thereof to LOCAL AGENCY including compensation <br />and expense of personnel working on PROJECT, required materials, and automotive <br />expense provided, however, LOCAL AGENCY shall contribute its general <br />administrative and overhead expense. <br />4. LOCAL AGENCY employees or its subcontractor engineering consultant shall be <br />responsible for all PROJECT engineering work. <br />5. LOCAL AGENCY shall not proceed with final design of PROJECT until final <br />environmental approval of PROJECT. Final design entails the design work necessary to <br />complete the PS&E and other work necessary for a construction contract but not required <br />earlier for environmental clearance of that PROJECT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.