My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (5)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:00:00 PM
Creation date
6/15/2015 3:44:47 PM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA PROFESSIONAL ENGINEERING, INC.
Contract #
Various
Agency
Public Works
Council Approval Date
3/17/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY 7 2095 <br />OPWA /EATovres (1) <br />CITY OF SANTA ANA <br />CONSTRUCTION CONTRACT <br />PROJECT NO. 12-6761:Traffic Signal Raitt St & Adams St <br />PROJECT N0, 14-6814: Class II Bilre Lane on First St <br />PROJECT NO. 14-6818: Class II Bike Lane on Newhope St <br />This CONSTRUCTION CONTRACT is made and entered into this 3rd day of March, 2015, by <br />and between the CITY OF SANTA ANA, CALIFORNIA, a charter city and municipal <br />corporation organized and existing under the Constitution and laws of the State of California, <br />hereinafter referred to as "CITY" and California Professional Engineering, Inc,_ hereinafter <br />referred to as "CONTRACTOR". <br />WITNESSETH: <br />The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as <br />follows: <br />CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost <br />and expense necessary to construct and complete in a good and workmanlike manner and to <br />the satisfaction of the City Engineer of the CITY, the Traffic Signal at Raitt and Adams and <br />Class II Bike Lanes on Newhope Street and First Street Improvements ("Work of <br />Improvement") identified in and in accordance with the Contract Documents prepared by the <br />City's Public Works Agency and approved by the City Council. <br />2. The complete Construction Contract consists of the "Contract Documents," as defined by the <br />Standard Specifications for Public Works Construction and which include the following: <br />• ..Notice Inviting Bids <br />• ..Instructions to Bidders <br />• ...Bid Proposal <br />• ..Bid Bond <br />• ..Contract Forms <br />• ..Contract Bonds <br />• ..General Provisions <br />• ...Special Provisions <br />• ...Technical Provisions <br />• ..Project Plans <br />• ...Appendices <br />In case of conflict between the Contract Documents, the precedence of documents shall be as <br />established in the Standard Specifications for Public Works Construction. <br />3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete Work <br />of Improvement the sum total amount not to exceed $684,670.17, as set forth and identified <br />in the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A". <br />The BID PROPOSAL contains a schedule of unit price(s) or lump sums) based on <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.