My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (24) - 2015
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (24) - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2015 12:57:10 PM
Creation date
6/24/2015 4:32:26 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
Contract #
A-2015-053
Agency
PUBLIC WORKS
Council Approval Date
4/21/2015
Expiration Date
4/21/2018
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />91 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />IA1 <br />22 <br />23 <br />24 <br />25 <br />26 <br />COOPERATIVE AGREEMENT NO. C-4 -1882 <br />BRISTOL STREET —TSSP <br />classification counts. <br />D. To develop and implement new timing plans optimized for signal synchronization. <br />E. To provide updated timing plans for all control systems and all relevant data used to <br />develop said plans to the PARTICIPATING AGENCIES. <br />F. To prepare a "Before and After Study" for the PROJECT as described in the Measure <br />M2 Eligibility Guidelines adopted by the AUTHORITY. The "Before and After Study" for the project is <br />considered the equivalent of the required Project Final Report (Measure M2 Ordinance No. 3, Section <br />B.111.9) for the PROJECT. The AUTHORITY shall provide the "Before and After Study" to the <br />PARTICIPATING AGENCIES in draft and final formats for review and comment. AGENCY comments <br />shall be noted in the final study. If specified in original PROJECT APPLICATION, the AUTHORITY <br />shall provide a "Before and After Study" video of a representative portion of PROJECT. <br />ARTICLE S. RESPONSIBILITIES OF THE PARTICIPATING AGENCIES: <br />The PARTICIPATING AGENCIES agree to the following responsibilities for implementation <br />and funding of the PROJECT: <br />A. Provide a technical representative to meet and participate as a member of the <br />PROJECT's Traffic Forum, <br />B. To authorize the AUTHORITY to manage, procure, and implement all aspects of the <br />PROJECT. <br />C. To participate and support the PROJECT implementation within the timeframe <br />outlined in the APPLICATION and consistent with the CTFP Guidelines adopted by the <br />AUTHORITY. <br />D. To provide the AUTHORITY all current intersection, local field master, and/or ATMS <br />timing plans and related data upon request. <br />E. To provide the local cash match and/or documentation for the in -kind services match <br />for the PROJECT in accordance with Attachment A. Failure to provide included local cash match <br />and/or evidence of in -kind services match may result in the loss of future participation for competitive <br />
The URL can be used to link to this page
Your browser does not support the video tag.