My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2015-05-05
Clerk
>
Agenda Packets / Staff Reports
>
Housing Authority (1999 - Present)
>
2015
>
05/05/2015
>
FULL PACKET_2015-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2015 9:21:27 AM
Creation date
6/25/2015 9:19:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/5/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 17 HUD 52531A <br />Agreement, Part 1 of 2 <br />Previous Editions are obsolete <br />Project-based Voucher Program <br />1.6 Schedule of Completion <br />A. Timely Performance of Work: The owner agrees to begin work no later than the <br />date for commencement of work as stated in section 1.4. In the event the work is <br />not commenced, diligently continued and completed as required under this <br />Agreement, the PHA may terminate this Agreement or take other appropriate <br />action. The owner agrees to report promptly to the PHA the date work is <br />commenced and furnish the PHA with progress reports as required by the PHA. <br />B. Time for Completion: All work must be completed no later than the end of the <br />period stated in section 1.4. Where completion in stages is provided for, work <br />related to units included in each stage shall be completed by the stage completion <br />date and all work on all stages must be completed no later than the end of the <br />period stated in section 1.4. <br />C. Delays: If there is a delay in the completion due to unforeseen factors beyond the <br />owner’s control as determined by the PHA, the PHA agrees to extend the time for <br />completion for an appropriate period as determined by the PHA in accordance <br />with HUD requirements. <br />1.7 Changes in Work <br />A. The owner must obtain prior PHA approval for any change from the work <br />specified in Exhibit B which would alter the design or quality of the rehabilitation <br />or construction. The PHA is not required to approve any changes requested by <br />the owner. PHA approval of any change may be conditioned on establishment of <br />a lower initial rent to owner as determined by PHA in accordance with HUD <br />requirements. <br />B. If the owner makes any changes in the work without prior PHA approval, the <br />PHA may establish lower initial rents to owner as determined by the PHA in <br />accordance with HUD requirements. <br />C. The PHA may inspect the work during rehabilitation or construction to ensure that <br />work is proceeding on schedule, is being accomplished in accordance with the <br />terms of the Agreement, meets the level of material described in Exhibit B and <br />meets typical levels of workmanship for the area. <br />4-7
The URL can be used to link to this page
Your browser does not support the video tag.