My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4 - HA Project Based Vouchers
Clerk
>
Agenda Packets / Staff Reports
>
Housing Authority (1999 - Present)
>
2015
>
05/05/2015
>
4 - HA Project Based Vouchers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2015 9:25:09 AM
Creation date
6/25/2015 9:24:23 AM
Metadata
Fields
Template:
City Clerk
Date
5/5/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
maintenance, utilities, and other services in accordance with the HAP <br />contract. The PHA must take into account complaints and any other <br />information that comes to its attention in scheduling inspections. <br />C. Violation of the housing quality standards <br />If the PHA determines a contract unit is not in accordance with the HQS, <br />the PHA may exercise any of its remedies under the HAP contract for all <br />or any contract units. Such remedies include termination, suspension or <br />reduction of housing assistance payments, and termination of the HAP <br />contract. <br />2. The PHA may exercise any such contractual remedy respecting a contract <br />unit even if the family continues to occupy the unit. <br />3. The PHA shall not make any housing assistance for a dwelling unit that <br />fails to meet the HQS, unless the owner corrects the defect within the <br />period specified by the PHA and the PHA verifies the correction. If a <br />defect is life threatening, the owner must correct the defect within no more <br />than 24 hours. For other defects, the owner must correct the defect within <br />no more than 30 calendar days (or any PHA -approved extension). <br />d. Maintenance and replacement—owner's standard practice <br />Maintenance and replacement (including redecoration) must be in accordance <br />with the standard practice for the building concerned as established by the owner. <br />9. LEASING CONTRACT UNITS <br />a. Selection of tenants <br />During the term of the HAP contract, the owner must lease all contract <br />units to eligible families selected and referred by the PHA from the PHA <br />waiting list. (See 24 CFR 983.251.) <br />2. The owner is responsible for adopting written tenant selection procedures <br />that are consistent with the purpose of improving housing opportunities for <br />very low-income families and reasonably related to program eligibility <br />and an applicant's ability to perform the lease obligations. <br />Consistent with HUD requirements, the owner may apply its own <br />admission procedures in determining whether to admit a family referred <br />Project -based Voucher Program <br />HAP Contract for New Construction or Rehabilitation <br />Previous editions are obsolete HUD 52530A Page - 8 - <br />of Part 2 <br />4-54 (04/2015) <br />
The URL can be used to link to this page
Your browser does not support the video tag.