My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITERIS, INC. 4 -2015
Clerk
>
Contracts / Agreements
>
I
>
ITERIS, INC. 4 -2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 4:42:33 PM
Creation date
6/25/2015 10:54:04 AM
Metadata
Fields
Template:
Contracts
Company Name
ITERIS, INC.
Contract #
A-2015-056
Agency
PUBLIC WORKS
Council Approval Date
4/21/2015
Expiration Date
12/31/2018
Insurance Exp Date
4/1/2017
Destruction Year
2023
Document Relationships
ITERIS, INC.
(Amended By)
Path:
\Contracts / Agreements\I
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant shalt prepare necessary PS&E, procure and implement the <br />Improvements. Cost shall not exceed the budget of $100,000 plus 10% <br />contingency. <br />b. BluFax <br />Consultant shall preCUre and install BluFaxfield units at 3 locations as <br />shown in A#aehment-3. Exhibit 2 -Appendix B <br />Consultant shall have the implementation of the Slufax units completed <br />and Integrated into Santa Ana's existing BluFax system prior to performing <br />any'Before' study, <br />c. IP Communication <br />Consultant shall procure and install all IP communication equipment (I.e. <br />Ethernet and fiber optic switches) as shown in the Exhibit 2 - Appendix B. <br />If necessary due to budget constraint, Santa Ana can assist In installing <br />and programming the equipment; consultant must provide detail costs and <br />state such request in the proposal. <br />3. City of Fountain Valley <br />No system procurement and Integration, <br />4. City of Costa Mesa <br />a. TMC <br />Consultant will work with Costa Mesa staff to determine the needs of the <br />City to upgrade its Traffic Signal System or Video Management and <br />Display Systems and related improvements. Consultant shall prepare <br />PS&E if necessary, procure and implement the system. Cost is not to <br />exceed the budget of $50,000 plus 10% contingency. <br />b. IP Communication <br />Consultant shall procure and install all IP communication equipment (i.e. <br />Ethernet and fiber optic switches) as shown In the Exhibit 2 - Appendix B <br />c. Traffic signal controllers replacement <br />Consultant shall procure and install ASC3 traffic signal controller as shown <br />in the Exhibit 2 - Appendix B. <br />IV, Task 4: Construction Management <br />Once the Improvements contracts are awarded to construction contractors, Consultant <br />shall provide engineering, coordination and documentation support with the contractor as <br />necessary to ensure proper and complete implementation of the project improvements. In <br />addition, Consultant shall provide the following services: <br />A. City of Garden Grove <br />Consultant, as representative for Santa Ana Construction Engineering, shall coordinate <br />with the contractor and oversee all the improvements within City of Garden Grove. <br />However, all construction Inspection services will be provided by City of Garden Grove. <br />B. City of Santa Ana <br />Santa Ana staff will provide all construction management and inspection services for <br />improvements within Santa Ana. <br />
The URL can be used to link to this page
Your browser does not support the video tag.