My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITERIS, INC. 4 -2015
Clerk
>
Contracts / Agreements
>
I
>
ITERIS, INC. 4 -2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 4:42:33 PM
Creation date
6/25/2015 10:54:04 AM
Metadata
Fields
Template:
Contracts
Company Name
ITERIS, INC.
Contract #
A-2015-056
Agency
PUBLIC WORKS
Council Approval Date
4/21/2015
Expiration Date
12/31/2018
Insurance Exp Date
4/1/2017
Destruction Year
2023
Document Relationships
ITERIS, INC.
(Amended By)
Path:
\Contracts / Agreements\I
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />Install Conduit �. <br />Fiber, CCTV <br />Cmnerl System, <br />Costa Mesa <br />19th St <br />tithrnat <br />Communication, <br />574,300 <br />1 <br />$3,100 <br />$74,300 <br />$77,400 <br />$15,480 <br />$0 <br />Cabinet Upgrade, <br />Battery Backup, <br />C:VP, ['ed U mde <br />Costa Mesa <br />Newport Blvd <br />Wilson St &. <br />Ethernet <br />Costa Mesa <br />Center Way <br />Communication, <br />$8,000 <br />1 <br />$1,400 <br />$8,600 <br />$9,400 <br />$1,880 <br />so <br />Controller upgrade <br />Ethernet <br />Costa Mesa <br />TMC <br />Communication, <br />558,00() <br />1 <br />51,400 <br />S58,00t1 <br />$59,400 <br />$11,880 <br />SO <br />•PMC (J } Tilde <br />SubtoinC Eslinmted cost of 'Pr•apored Sigxnl Syrtern Lrgn•uvonrerrrs'"(torn( <br />combiner( <br />545,900 <br />$1,468,800 <br />$1,534,70( <br />$280,740 <br />$26,600 <br />g. Contingency (up -to 10% of the estimated costs of "Proposed Signal System <br />—" <br />Improvements") <br />5146,880 <br />$29,376 <br />$0 <br />h. Construction management (up to 15% oftlte estimated costs of"Proposed <br />$i mal system Improvements" for support and inspection costs) <br />$220320 <br />$0 <br />$44,064 <br />Total 2 -Signal System Improvements, Construction Support/Inspection, <br />and Continuency Costs <br />$1,901 ,900 <br />$309,716 <br />$70,664 <br />Totals 1+2 <br />$2211,900 <br />$442380 <br />*: Details of improvement and cost are listed in the Appendix B <br />1'1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.