Laserfiche WebLink
RESOLUTION 2015-027 <br />REVENUEFY 15-16 <br />ACCOUNTDEPARTMENT/MISCELLANEOUS FEE OR SERVICEUNITFEES <br />SECTION IXPLANNING & BUILDING AGENCY <br />$200.53 <br />53600 <br />132)Cell Tower - Structural Plan Checkhourly <br />$200.53 <br />53600 <br />133)Deferred Submittal - Structural Plan Checkhourly <br />$200.53 <br />53600 <br />134)Rooftop equipment - Structural Plan Checkhourly <br />$200.53 <br />53600 <br />135)Equipment Changeout - Structural Plan Checkhourly, min 1/2 hr <br />$200.53 <br />53600 <br />136)Dust Collecting - Structural Plan Checkhourly <br />$200.53 <br />53600 <br />137)Above/Below Ground Tank - Structural Plan Checkhourly <br />$200.53 <br />53600 <br />138)Trash Enclosures - Structural Plan Checkflat <br />$200.53 <br />53600 <br />139)Lighting Standards - Structural Plan Checkhourly, min 1/2 hr <br />$144.65 <br />51601 <br />140)Lighting Standards - Inspectionhourly <br />$200.53 <br />53600 <br />141)Pedestrian Protection - Structural Plan Checkhourly, min 1/2 hr <br />$144.65 <br />51601 <br />142)Pedestrian Protection - Inspectionhourly, min 2hr <br />$200.53 <br />53600 <br />143)Security Card Reader - Structural Plan Checkhourly, min 1/2 hr <br />$200.53 <br />53600 <br />144)Fire Damage Repair, Structural - Plan Checkhourly <br />$51.73 <br />51601 <br />145)Certificate of Occupancy inspectionflat <br />$435.29 <br />51601 <br />146)Temporary Certificate of Occupancyflat <br />e) <br />Revision - Structural Plan Check $200.53 <br />53600 <br />147)hourly, min 1/2 hr <br />$200.53 <br />53601 <br />148)Revision - EMP Plan Checkhourly, min 1/2 hr <br />53602 <br />53603 <br />149)Special Inspectionhourly$144.65 <br />51601 <br />51602 <br />51601 <br />150)Relocation Inspections <br />$440.39 <br /> Main building or structureEach <br />$87.36 <br /> Accessory structureEach <br />$0.86 <br /> Inspection for structures located outside of the CityPer Mile <br />$87.36 <br /> Travel timePer Hour <br />36 <br /> <br />