Laserfiche WebLink
RESOLUTION 2015-027 <br />REVENUEFY 15-16 <br />ACCOUNTDEPARTMENT/MISCELLANEOUS FEE OR SERVICEUNITFEES <br />SECTION IXPLANNING & BUILDING AGENCY <br />$47.23 <br />51603 <br />196)Above Ground Spa <br />$43.74 <br />51603 <br />197)Demolition <br />$67.81 <br />51603 <br />198)Signs & Neon/LED Decorative Lighting <br /> (refundable bond) <br />New or Total Rewire for Single Family Dwellings: <br />$0.13 <br />51603 <br />199)SFD (per square foot)sq. ft. <br />$0.13 <br />51603 <br />200)Garage (per square foot)sq. ft. <br />$220.33 <br />Temporary Electrical Service, Prior to approval or <br />51603201)Each Meter <br />Occupancy (30 Days) <br /> At the time of application for temporary power, the owner <br /> shall post a $1,000.00 cash or cashier's check conforming to the <br /> Santa Ana Municipal Code Section 8-1768 for each service <br />meter. This deposit shall be released upon request after the <br /> Certificate of Completion or Certificate of Occupancy is issued. <br />$49.68 <br />51604 <br />202)Permit Issuance Fee <br />$66.23 <br />51604 <br />203)Minimum Fee (Nonresidential) <br />53603 <br />204)Stand Alone Mechanical Plan Check 65% of Subtotal <br />Furnace including ducts & vents (each) <br />$59.19 <br />51604 <br />205)Up to 100,000 BTU <br />$84.47 <br />51604 <br />206)Over 100,000 BTU <br />$114.55 <br />51604 <br />207)Furnace/Compressor Combo (Residential) <br />Each Compressor, Boiler or Heat Pump (packaged or split system) <br />$81.41 <br />51604 <br />208)Up to 5 HP <br />41 <br /> <br />