Laserfiche WebLink
RESOLUTION 2015-027 <br />REVENUEFY 15-16 <br />ACCOUNTDEPARTMENT/MISCELLANEOUS FEE OR SERVICEUNITFEES <br />SECTION IXPLANNING & BUILDING AGENCY <br />$20.69 <br />5160228) For repair or alteration of drainage or vent piping, Each <br /> each fixture <br />$30.47 <br />5160229) For each appliance, fixture or piece of equipment regulatedEach <br /> by this code but not classed in other categories, for <br /> which no other fee is listed in this code <br /> (a) Sewage Ejector <br /> (b) Sump Pump <br /> (c) Hot Water Storage Tank <br /> (d) Heat Exchanger <br /> (e) Cooling Tower <br /> (f) House Booster Pumps <br /> Temporary Gas Service, Prior to Approval <br />30) $220.33 <br />51602Each Meter <br /> Or Occpancy (30 Days) <br /> At the time of application for temporary power, the owner <br /> shall post a $1,000.00 cash or cashier's check for each service meter. <br /> This deposit shall be released upon request after the <br /> Certificate of Completion or Certificate of Occupancy is issued. <br />$87.36 <br />5160231) Inspections outside of normal business hours (4 hour Per Hour <br /> minimum charge for Holidays, Saturday or Sunday <br /> inspections). <br />$87.36 <br />5160232) Re-inspection fee assessed under applicable provisions Per Hour <br /> of the Building Code <br />$87.36 <br />5160233) Inspections for which no fee is specifically indicatedPer Hour <br /> (minimum charge - one (1) hour) <br />$87.36 <br />5160234) Additional plan review required by changes, additions orPer Hour <br /> revisions to approved plans (minimum charge -one (1) hour) <br />PLUMBING PLAN CHECK FEES <br />Whenever plumbing plans are required by the Building <br />Official, plan check fees shall be 65% of the plumbing <br />permit fee and shall be paid at the time of submitting plans. <br />67 <br /> <br />