My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - STREETCAR MOU
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
07/07/2015
>
25C - AGMT - STREETCAR MOU
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2015 8:45:54 AM
Creation date
7/2/2015 4:12:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
7/7/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Indemnification <br />• Insurance <br />• Issue Resolution <br />7.1 Authorization to Construct <br />In the event the Public Way Use Agreement is not in place prior to the initiation of <br />construction activities, OCTA is authorized to advance construction activities, contingent <br />upon the Santa Ana's approval of design plans and authorization of construction <br />permits. Santa Ana shall not unreasonably withhold approvals or construction permits if <br />OCTA has met Santa Ana's existing standards and regulations. Unless related to public <br />safety, the City's standards shall be those in place at the beginning of design. <br />SECTION 8 OPERATIONS & MAINTENANCE <br />This Section is intended to provide an understanding of general terms and conditions <br />between the Parties for the operations and maintenance of the Streetcar System within <br />the jurisdiction of Santa Ana. An Operations and Maintenance Agreement shall in good <br />faith be developed between the Parties to define in detail the roles, responsibilities, and <br />expectations regarding the operations and maintenance of the Streetcar System and <br />adjacent Santa Ana facilities for as long as the Streetcar System is providing service as <br />intended. Topics to be addressed in detail in the Operations and Maintenance <br />Agreement shall include, but not limited to, the following: <br />Operations <br />Fare /Revenue Policies <br />• <br />System Operations <br />• <br />Streetcar /Traffic Signal <br />Maintenance <br />Coordination <br />• <br />Protection of Adjacent Facilities <br />• <br />Adjacent City Facilities <br />• <br />Notice and Approvals <br />• <br />City Access to Streetcar Track <br />• <br />OCTA Maintenance <br />Area <br />Responsibilities <br />• <br />Right of Way Permits <br />• <br />City Maintenance Responsibilities <br />• <br />Fire /Life /Safety /Security <br />• <br />Lighting <br />Coordination <br />• <br />Track <br />• <br />Emergency Procedures <br />• <br />OCS <br />• <br />Emergency Drills <br />• <br />Traction Power <br />• <br />Emergency Access <br />• <br />Structures <br />• <br />Fare Collection <br />• <br />Pavement <br />• <br />Special Events <br />• <br />Street Lights <br />• <br />Displays and Attachments <br />• <br />Artwork <br />• <br />Advertising <br />• <br />Storm Drainage <br />• <br />OCTA Operating Costs <br />• <br />Utilities <br />• <br />City Operating Costs <br />• <br />Maintenance Costs <br />• <br />Service Agreements <br />• <br />Service Agreements <br />14 25C -22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.