My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - STREET TREE MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
07/07/2015
>
25B - AGMT - STREET TREE MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2015 8:45:34 AM
Creation date
7/2/2015 4:45:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
7/7/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />CITY OF SANTA ANA <br />STREET TREE MAINTENANCE SERVICES <br />SCOPE OF SERVICES <br />Contractors must provide costs for each of the service categories described in the specifications outlined <br />In EXHIBIT F. Contractors must also list all deviations from specifications, if any. The routine <br />maintenance locations will serve as the basis for the RFP. At the discretion of the Projects Manager or <br />designee, one or more optional add -on locations and specialized services may or may not be included in <br />the agreement with contractor, In addition, the City at the discretion of the Projects Manager or <br />designee, reserves the right to decrease the scope of work during the duration of the agreement. <br />FUNCTIONS AND RESPONSIBILITIES <br />A. PROJECTS MANAGER <br />The Projects Manager or designee shall have the authority to accept/reject materials, <br />workmanship and to make minor changes In work or schedule. When the performance of <br />the work or completion per schedule is determined to be sub - standard, he /she may (1) <br />recommend that all or a portion of payment be withheld, and /or forfeiture for delay to be <br />resulting costs, Payment to be withheld shall be deducted from the next monthly payment <br />due the Contractor, or if the amount is insufficient to cover payment, the Contractor shall be <br />liable and will be billed accordingly. <br />The Projects Manager or designee shall decide all questions, which may arise as to the <br />manner of performance and completion per schedule, acceptable fulfillment of the <br />contract by the Contractor, interpretation of the specifications, and compensation to <br />include completion of work by alternate sources. <br />S. CONTRACTOR <br />(1) Contractor's Office <br />Contractor is required to maintain an office /yard within a sixty (66) minute response <br />time of the job site and provide the office with phone service during normal working <br />hours. During all other times, a telephone answering service shall be utilized and <br />the answering service shall be capable of contacting the Contractor by radio or cell <br />phone. Contractor shall have a maximum response time of sixty (60) minutes to all <br />emergencies. There will be no on -site storage of equipment or materials. <br />Contractor will have full responsibility for maintaining an office and a yard. <br />(2) Submittals <br />The Contractor shall submit to the Projects Manager or designee at the beginning <br />of work, 1) a detailed job schedule, 2) time sheet, 3) names and titles of all persons <br />working on the project, and 4) materials and /or chemicals to be used on the project <br />for approval. All submittals shall be periodically updated as necessary. The <br />Projects Manager or designee shall be immediately notified of any deviation from <br />schedule or material usage. Contractor shall provide sufficient personnel to <br />accomplish the work within the allotted time frames as Indicated in this <br />specification, <br />(3) Uniforms /Identification <br />25B -12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.