My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GILLIS, PANICHAPAN ARCHITECTS, INC. 3 - 2015
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
GILLIS, PANICHAPAN ARCHITECTS, INC. 3 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:05:23 AM
Creation date
7/21/2015 2:53:44 PM
Metadata
Fields
Template:
Contracts
Company Name
GILLIS, PANICHAPAN ARCHITECTS, INC.
Contract #
A-2015-118
Agency
Public Works
Council Approval Date
6/16/2015
Expiration Date
6/16/2016
Insurance Exp Date
7/24/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix <br />ATTACHMENT <br />SCOPE OF WORK <br />CITY OF SANTA. ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />ARCHITECTURAL SERVICES <br />SANTA ANA REGIONAL TRANSPORTATION CENTER <br />ADA IMPROVEMENTS <br />RFP NO.: 15-028 <br />Introduction and Description of Work <br />The Santa Ana Regional Transportation Center (SARTC), 1,000 East Santa Ana Boulevard, was built in 1985. <br />It is a Spanish colonial structure serving Amtrak, Metrolink, is a hub for the Orange County Transportation <br />Authority bus system and is also a terminal for several Mexican bus tour companies, The Center also leases <br />office space to the State of California Economic Development Department, County of Orange Social Service <br />Agency and the Santa Ana Work Center. <br />The main building is a three story structure with lobby area, ticketing, gift shop, cafd, restrooms, and office <br />spaces. The 5 -story entry tower houses assembly areas on the fourth and fifth levels, On the exterior it is <br />flanked by north -south bound train platforms, pedestrian bridge, outdoor courtyard area, passenger <br />loading/unloading, surface parking lots for vehicle, bus and taxi, and a three-story parking structure. <br />The facility and its surrounding site needs to be upgraded to be fully compliant with current Federal and State <br />Regulations as they pertain to the American's with Disabilities Act (ADA). This includes the Federal "2010 <br />ADA Standards for Accessible Design" as written by the U,S. Department of Justice, and the 2013 California <br />Building Code (Title 24, Part 2, of the California Code of Regulations), <br />An ADA compliance survey was completed by the City in May 2012, The City is seeking an Architectural fine <br />to take the findings from this survey and prepare Contract Documents to address the deficiencies so the project <br />can be competitively bid for construction. The project construction budget is $139,000. <br />The Scope of Work area includes, but is not limited to, the complete interior of the facility, surrounding <br />courtyards, colonnades, and drop-off areas, train loading platforms, pedestrian bridge, sidewalks, surface <br />parking lots, parking structure, and public right-of-way. <br />Consultant Responsibilities: <br />The Consultant's responsibilities shall consist of the following project tasks: <br />Task 1: Pre Design <br />Preliminary design phase shall include Kick-off meeting with City Staff to discuss scope of work, project goals and <br />objectives, potential elements and issues, schedule, and to receive and discuss 2012 SARTC Accessibility Study <br />prepared by City of Santa Ana. <br />Consultant shall thoroughly review 2012 SARTC Accessibility Study and conduct additional site investigations as <br />required to determine current conditions and completeness of report. <br />City of Santa Ana RFP 15-028 <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.