My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GILLIS, PANICHAPAN ARCHITECTS, INC. 3 - 2015
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
GILLIS, PANICHAPAN ARCHITECTS, INC. 3 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:05:23 AM
Creation date
7/21/2015 2:53:44 PM
Metadata
Fields
Template:
Contracts
Company Name
GILLIS, PANICHAPAN ARCHITECTS, INC.
Contract #
A-2015-118
Agency
Public Works
Council Approval Date
6/16/2015
Expiration Date
6/16/2016
Insurance Exp Date
7/24/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 2. Design Development (50%plans) <br />Design development phase will involve development of plans based upon Task 1 information and analysis. <br />A Deliverables from this task shall include a 50% set of phis, draft outline specification and "Opinion of <br />Probable Cost'. <br />Task 3: Construction Documents (90% and 100%plans) <br />Construction Documents phase (CDs) shall include finalizing plans and specifications from the Design <br />Development phase. This includes the provision of detailed engineering and construction drawings that will serve <br />as the basis for both bidding and construction by a general contractor. <br />A Deliverables from this task shall include 90% and 100% plans, final technical specifications, and a <br />finalized "Opinion of Probable Cost". <br />Plans: <br />Plans shall include, but are not limited to the following: <br />• Title Sheet <br />• Site Plan, including: <br />o Surface parking lots <br />o Right of Way improvements <br />o Accessible Route of Travel <br />o Striping, signage and detailing, as required <br />• Parking Structure <br />o Plans <br />o Striping, signage and detailing, as required <br />• Architectural <br />o Building Floor Plan <br />o Enlarged Restroom Plans <br />o Interior Elevations, as required <br />Building Sections, as required <br />Architectural Details, as required <br />Plans shall be submitted at 90% completion for City staff review, and revised per City comments to produce a <br />100% complete construction drawing package, It is imperative that the consultant exercise care and <br />completeness when implementing plan check continents, to keep project moving more as expeditiously as <br />possible. The City will then conduct one more cursory review prior to obtaining all final approvals and <br />signatures. <br />Technical Specifications <br />Technical specifications for all components listed above shall be provided by Consultant, or their Sub - <br />consultants, to the City in CSI (Construction Specifications Institute) format, City Staff will combine these <br />specifications with the City Boller Plate which together, will become the Project Manual. <br />Final Opinion of Probable Cost <br />Consultant shall provide updated opinion of probable construction cost which shall reflect finalized plans. <br />T City of Santa Ana RFP 15 - <br />Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.