My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25L - AGMT - ON-CALL RIGHT OF WAY SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
08/04/2015
>
25L - AGMT - ON-CALL RIGHT OF WAY SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2015 10:29:01 AM
Creation date
7/30/2015 5:10:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25L
Date
8/4/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
way policies and procedures manual. Epic's approach to commercial relocations emphasizes <br />preventing or mitigating possible goodwill claims by providing high quality referrals and actively <br />soliciting feedback from the business owner. <br />Overall Property Management Services will be handled by Karen Starr CPMO, RNV -AMC, <br />SR/WA, Epic "s property management staff has years of experience and business relationships <br />with general contractors and construction managers to handle all emergency repairs. Our <br />relationships with a variety of vendors include environmental assessment and romediation firms, <br />demolition and site clearance firms, :architecture and construction firms to provide curative work, <br />electricians, plumbers, roofers, carpenters, and general handymen, Upon receiving the survey <br />report, a scope of work will be prepared for the performance of the abatement, handling and <br />disposal of the discovered hazardous materials. The scope of work will there 'be utilized in <br />obtaining bids from qualified asbestos and lead - abatement/demolition contractors. The <br />demolition coordination tasks include the following:: <br />• Preparing written notices to utility companies to request the removal of all meters and <br />dries affected by the demolition work <br />• Preparing, scope of work for the performance of demolition. <br />• Pre -bid job walks <br />• Reviewing and analyzing submitted bids to ensure the selection, of the lowest, qualified <br />bidder <br />• Using CAL /OSHA certified and licensed contractors <br />• Reviewing that all required documentation and notifications (including all required <br />permits) are completed prior to the commencement of the activities <br />• Verifying disconnection of utilities and that area Is secure: <br />• Job site inspections to verify that contractor is following all guidelines and precautionary <br />measures to prevent the discharge of pollutants into storm drains, `keeping the site clean <br />and free of rubbish and debris and that water Is being used to suppress dust <br />• Ensuring that contractor abides by all safety and precautionary measures detailed in the <br />scope of work, e.g. Installing temporary chain link fencing, pedestrian canopies, and <br />caution signage <br />• Conducting final inspeotion <br />• Preparing and distributing close -out file Information to the City, including copies of all <br />permits and manifests <br />The following section further describes the strategies comprising Epic's innovative solutions to <br />guarantee a project's success, <br />Planning: Upon receiving a "Notice to Proceed" from the City, Project Manager Ron wicks will <br />schedule a kick -off meeting with the City, where he will introduce the entire project team; review <br />project assignments and establish dines of commun €cation, . procedures and protocols. The <br />meeting will also review project scope, begin the initial discussions on the acquisition and <br />relocation plans and the quality control plan, review schedule and budget, discuss anticipated <br />project Issues and Identify the project's critical paths, <br />Quality Control: All documents prepared by Epic will be reviewed by at least one other <br />experienced agent before submission to the City. Wicks Wit review all project reports, Electronic <br />9 <br />25L -207 <br />
The URL can be used to link to this page
Your browser does not support the video tag.