My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25L - AGMT - ON-CALL RIGHT OF WAY SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
08/04/2015
>
25L - AGMT - ON-CALL RIGHT OF WAY SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2015 10:29:01 AM
Creation date
7/30/2015 5:10:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25L
Date
8/4/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LaealAssistance Procedures Manual <br />Extitttrr 10-K CONSULTANT C FWfITICATION OF CONTRACT COSTS AND FiNANUAI, <br />MANAGEMENT SYSTEM <br />(Tote: <br />Vrequesting to utilize The Safe Harbor Indirect Cost Rate submitAilacharent I of <br />DLA -OB )3.07 - Safe Harbor 7rtdirect CostRatefarConsuttayitContraods found at <br />http,llwwr p,dot ca govlhglLoca [Pi,ograt)tslDLA_QGIDZtt –O hMa in lieu of ttt s forrtt „i <br />Certification of Final Indirect Costs. .j <br />Consultant Firm Name; � "y;L _– <br />Indirect Cost Rate; —ple * for fiscal period (mmlddlyyyy to mmldd /yyyy) <br />*Fiscal period covered for Indirect Cost Rate developed (riot the contract period). <br />Local Government; <br />Contract Nuinber; Pra)ect Number: <br />1, the undersigned, certify that I have reviewed the proposal to establish Fund indirect cost rates for the fiscal <br />period As specified above and to the bast of my knowledge and belief-, <br />1, All costs included in this proposat to establish final Indirect Cost Rates are allowable in <br />accordance with the oust principles of`the Federal Acguisitfou Re$ulati ins {FAR) of Title 48, <br />Coda of Federal Regulations (CFR) ,Part 31, <br />2. This proposal does not include any costs which Are expressly unallowable, under the Cost <br />principles of the FAR of 48 CFR, Part 3t. <br />10 -K <br />All known material transactions or events that have occurred affecting the firm's ownership, o`rganizalion, and <br />Indirect Cost Rates have been disclosed as of the date of proposal preparation noted above;., <br />Certification of Tinancial MAritiggmen Systernz <br />t, the undersigned, certify to the bast of my knowledge and belief that our Financial Management System meets <br />the standards tar financial reporting, accounting records, Internal and budget control as set forth in the FAR of <br />Title 44, CFR, Part I a,20 to the extent applicable to Consultant. <br />Certification of Dollar Amount for all A &E Contracts, <br />I, the undersigned, certify that the approximate dollar amount of at] A &E contracts awarded by Caltrans or a <br />California local agency to this firm within the last three (3) calendar years for all State DOT and Local Agencies <br />is Si and the number of states in which the firm does business is , <br />Certification of Direct Costs: <br />1, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost <br />proposal(s) in this contract are reasonable, allowable and allocable to the contract in accordance with the cost <br />principles of the EAR of Title 48, CFR, Part 31. Allowable direct costs to it Government contract shall be: <br />Page 1 of 2 <br />LPP25.01 January 14, 2015 <br />25L -32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.