Laserfiche WebLink
w <br />N 0 ■ CITY OF SANTA ANA On -Call Engineering Services-Part B RFP 14 -0376 <br />DEMONSTRATED VALUE <br />Below is staff hours estimate to complete the sample task order. <br />11 im <br />Deliverables, Test or Services <br />Project Kick - off /Meetings <br />Principal Engineer <br />Project Manager <br />Project Engineer <br />Survey <br />Two person survey crew* <br />Project Surveyor <br />Geotechnical & Soils Report <br />Materials Testing (equipment and lab fees) <br />Geotechnical Engineer (Licensed) <br />Assistant Geotechnical Engineer <br />Privacy Wall Desion/CADD Plans <br />Project Manager <br />Project Engineer <br />Design Engineer <br />CARD person <br />Specifications <br />Project Manager <br />Project Engineer <br />Design Engineer <br />Engineer's Estimate <br />Project Manager <br />Project Engineer <br />Design Engineer <br />AS -BUilt Plans <br />Project Engineer <br />Hours <br />2 <br />10 <br />10 <br />I <br />20 <br />40 <br />8 <br />20 <br />60 <br />40 <br />2 <br />12 <br />8 <br />2 <br />8 <br />12 <br />I <br />Total 268 <br />*Some positions /work tasks will be subject to prevailing wages. <br />Note: The listing of the specific positions above is not intended to mean that each position <br />listed will necessarily have hours included in the above. The positions simply represent the <br />types of positions that might be utilized for each subtask to streamline the City's review of this <br />information. Please utilize the categories listed to the extent possible. <br />MARX THOMAS & taMPANY - <br />25M-4 <br />