Laserfiche WebLink
X. <br />A <br />CONSULTING <br />Project Manager /Proj Coordinator 2 $ 150 $ 300 <br />Assistant Level Design Engineer $ <br />Draftsperson $ - <br />Adminfrypist 2 $ 70 $ 140 <br />Engineer's Estimate <br />Principal Engineer <br />1 <br />$ <br />175 <br />$ <br />175 <br />Registered Engineer <br />2 <br />$ <br />140 <br />$ <br />280 <br />Project Manager /Proj Coordinator <br />2 <br />$ <br />150 <br />$ <br />300 <br />Assistant Level Design Engineer <br />6 <br />$ <br />100 <br />$ <br />600 <br />Draftsperson <br />6 <br />$ <br />80 <br />$ <br />- <br />Admin/Typist <br />$ <br />- <br />As -Built Plans <br />Principal Engineer <br />$ <br />175 <br />$ <br />Registered Engineer <br />2 <br />$ <br />140 <br />$ <br />280 <br />Project Manager /Proj Coordinator <br />2 <br />$ <br />150 <br />$ <br />300 <br />Assistant Level Design Engineer <br />4 <br />$ <br />100 <br />$ <br />400 <br />Draftsperson <br />6 <br />$ <br />80 <br />$ <br />480 <br />Admin/Typlst <br />$ <br />- <br />Total 180 $ 2,868 $ 25,830 <br />`Some positions /work tasks will be subject to prevailing wages. <br />Note: The listing of the specific positions above is not intended to mean that each position <br />listed will necessarily have hours included in the above. The positions simply represent the <br />types of positions that might be utilized for each subtask to streamline the City's review of this <br />information. Pease utilize the categories listed to the extent possible. <br />25M -451 <br />