My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RESO 2015-20_1411SVillageWay
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2015
>
RESO 2015-20_1411SVillageWay
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2015 9:53:17 AM
Creation date
8/27/2015 9:53:05 AM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
RESO 2015-20
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FXHIRIT A <br />Conditions for Conditional Use Permit No 2015 -12 <br />Should the Planning Commission approve Conditional Use Permit No. 2015 -12, the <br />approval is subject to compliance, to the reasonable satisfaction of the Planning <br />Manager, with all applicable sections of the Santa Ana Municipal Code, the California <br />Administrative Code, the California Building Standards Code and all other applicable <br />regulations. <br />The applicant must comply in full with each and every condition listed below prior to <br />exercising the rights conferred by this conditional use permit. <br />The applicant must remain in compliance with all conditions listed below throughout the <br />life of the conditional use permit. Failure to comply with each and every condition may <br />result in the revocation of the conditional use permit. <br />A. Planning Division <br />1. All proposed improvements must conform to the Site Plan Review <br />approval of DP No. 2015 -4 and the staff report exhibits. <br />2. Any amendment to this conditional use permit must be submitted to the <br />Planning Division for review. At that time, staff will determine if <br />administrative relief is available or the conditional use permit must be <br />amended. <br />3. The site occupant shall be responsible for maintaining the premises free <br />from graffiti and litter, including the side of the building adjacent to the Costa <br />Mesa Freeway. All graffiti and litter shall be removed within 24 hours. <br />B. Police Department <br />1. The existing building and required parking must conform with the <br />provisions of Chapter 8, Article II, Division 3 of the Santa Ana Municipal <br />Code (Building Security Ordinance). These code conditions will require <br />that the existing projects lighting, door /window locking devices and <br />addressing be upgraded to current code standards. Lighting standards <br />cannot be located in required landscape planters. <br />Resolution No. 2015 -20 <br />Page 5of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.