Laserfiche WebLink
EXHIBIT A <br />Conditions of Approval for Vesting Tentative Tract Map No. 2015 -01 <br />Vesting Tentative Tract Map No. 2015 -01 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with all applicable sections of the Santa Ana Municipal Code, <br />the California Administrative Code, the California Building Standards Code and all other applicable <br />regulations. <br />The applicant must comply in full with each and every condition listed below prior to exercising the <br />rights conferred by this vesting tentative tract map. <br />The applicant must remain in compliance with all conditions listed below throughout the life of the <br />vesting tentative tract map. Failure to comply with each and every condition may result in the <br />revocation of the vesting tentative tract map. <br />A. Planning Division <br />1. The project shall comply with all conditions, standards, requirements, plans, and elevations <br />approved by the Development Review Committee (DRC) for the development project (DP No. <br />2014 -23). <br />2. Covenants, Conditions and Restrictions (CC &Rs) for this project must be reviewed and <br />approved by City prior to approval of the final tract map. At a minimum, the CC &Rs shall <br />include provisions pertaining to owner occupancy, restrictions on home -based businesses, <br />the prohibition of storage on balconies, means for securing any publicly - accessible open <br />spaces, and a restriction on truck delivery hours to non -peak periods. <br />3. The final landscape plan shall depict installation of a perimeter block wall on the project site <br />except in front yard setback areas. The landscape plan shall also contain perimeter block wall <br />construction details, finishes, decorative elements, and accommodation for landscaping to <br />deter graffiti. <br />4. All real estate signage must be removed from the site within one year from the date of <br />installation. An extension of time may be granted as determined by the Planning Manager. <br />5. All site activities associated with grading and construction shall be screened by temporary <br />construction fencing. Such fencing shall be secured and contain durable green mesh. <br />6. Graffiti on any portion of the project site before, during, and after construction shall be removed <br />within 24 hours of first appearance. <br />7. Should the project be built in phases, any phase shall at all times comply with the standards of <br />the Harbor Mixed Use Transit Corridor Specific Plan. <br />Resolution No. 2015 -21 <br />Page 5 of 6 <br />