My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RESO 2015-25_1010SHarbor
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2015
>
RESO 2015-25_1010SHarbor
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2015 10:07:52 AM
Creation date
8/27/2015 10:07:40 AM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
Doc #
RESO 2015-25
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT <br />Conditions of Approval for Tentative Tract Map No. 2015 -02 <br />Tentative Tract Map No. 2015 -02 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with all applicable sections of the Santa Ana <br />Municipal Code, the California Administrative Code, the California Building Standards <br />Code and all other applicable regulations. <br />The applicant must comply in full with each and every condition listed below prior to <br />exercising the rights conferred by this approval. <br />The applicant must remain in compliance with all conditions listed below throughout the life <br />of the tentative tract map. Failure to comply with each and every condition may result in <br />the revocation of the tentative tract map. <br />A. Planning Division <br />1. An Inclusionary Housing Agreement will be recorded against the property, <br />approved by the Executive Director of Community Development and the <br />City Attorney prior to issuance of building permit. <br />2. Two copies of the recorded final tract map shall be submitted each to the <br />Planning Division, Building Division and Public Works Agency within 10 <br />days of recordation. <br />3. The tentative tract map, final map and all improvements required to be <br />made or installed by the subdivider shall be in accordance with the <br />requirements and design standards and specifications of the City of Santa <br />Ana and the requirements of the State Subdivision Map Act. <br />4. Two copies of the recorded final map and CC &Rs shall be submitted each to <br />the Planning Division, Fire Department, Building Division, and Public Works <br />Agency within 10 days of recordation. <br />5. After project occupancy, landscaping is to be maintained in accordance <br />with the landscape plan approved for the project. This shall include the <br />minimum levels of plant materials shown on the landscape plan and <br />installed at the time of occupancy. <br />6. All real estate signage must be removed from the site within one year from <br />the date of installation. An extension of time may be granted as determined <br />by the Planning Manager. <br />7. The final map must be approved and recorded prior to issuance of building <br />permits. <br />Resolution No. 2015 -25 <br />Page 5of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.