Laserfiche WebLink
ROB BATHKE, PE, QSD <br />Civil Engineer <br />Education : Mr. Bathke is an associate and senior civil engineer at DEA with more than 28 <br />B.S., Civil Engineering, 1985, i years of experience. He manages projects that require site civil engineering, <br />Northern Arizona University, : street improvement design, traffic control, infrastructure improvements, and <br />Flagstaff : storm drainage improvements. His client base includes public agencies, public <br />works departments, and private developers of commercial and residential <br />Registration projects. <br />Professional Civil Engineer, <br />California (48138), 1991 Experience: <br />Qualified SWPPP Developer, <br />2011, ( #01081) ; Tracks at Brea — Segment 3, Brea, California <br />The IDEA team prepared conceptual and final construction documents for a one <br />Years of Experience : mile segment of Class I meandering trail through an abandoned rail corridor <br />28 : in Brea. Segment 3 included work between Brea Boulevard and State College <br />i Boulevard and incorporates both hard and soft surface trail, native plantings, <br />site furnishings, and a lighted parking area. Mr. Bethke was responsible for <br />design of the trail alignment, materials, infrastructure and street improvements. <br />Santa Clara River Trail, Phase ll, Santa Clarita, California <br />Mr. Bethke served as assistant project manager for Phase II of the Santa Clara <br />River trail project in the city of Santa Clarita. The trail serves as a multi -modal <br />recreation trail for commuter bicycle, pedestrian and equestrian use. This project <br />was a vital link in the Santa Clara River trail system that links the city of Santa <br />Clarita with the Pacific Ocean in Ventura. 20 <br />South Fork River Trail, Phase IV, Santa Clarita, California <br />Mr. Bethke served as project engineer for this 1.3 -mile recreational trail. This <br />project involved coordination with numerous governing agencies for design <br />compliance. Design of the project included grading, drainage, hydraulic analysis, <br />and concrete structural design for elements within the Santa Clara River. <br />Santa Clara River Trail, Phase III, Santa Clarita, California <br />Mr. Bethke served as project manager for Phase III of the Santa Clara River trail <br />project. He provided conceptual design, which included two alternate studies <br />involving route alignment for an undercrossing at Bouquet Canyon Road and a <br />route over an existing sanitation district outfall facility. Mr. Bethke prepared final <br />construction documents, which included trail plan and profile, grading, drainage, <br />hydraulic analysis, and concrete structural calculations. <br />Kern River Trail Specific Plan, Kern County, California <br />As lead engineer, Mr. Bathke was involved in the master planning for <br />approximately 15 miles of multi -use trail along the Kern River from Bakersfield, <br />east to the mouth of the canyon beyond Rio Bravo. Three separate alternatives <br />were developed for the trail alignment including research for destination points, <br />access, ingress, egress, rest stops, signage, trail surfacing, fencing, and mixed <br />uses. The project included research and data collection, site analysis, project <br />coordination and conflict resolution, a needs analysis, trail planning and design <br />and the preparation of an Environmental Impact Report. The final report included <br />such items as a Mission Statement, background data, coordination with other <br />planning efforts, natural resources and trail facilities, trail development codes, <br />design standards, signage, maintenance, and implementation. <br />25L -34 <br />