ROB BATHKE, PE, QSD
<br />Civil Engineer
<br />Education : Mr. Bathke is an associate and senior civil engineer at DEA with more than 28
<br />B.S., Civil Engineering, 1985, i years of experience. He manages projects that require site civil engineering,
<br />Northern Arizona University, : street improvement design, traffic control, infrastructure improvements, and
<br />Flagstaff : storm drainage improvements. His client base includes public agencies, public
<br />works departments, and private developers of commercial and residential
<br />Registration projects.
<br />Professional Civil Engineer,
<br />California (48138), 1991 Experience:
<br />Qualified SWPPP Developer,
<br />2011, ( #01081) ; Tracks at Brea — Segment 3, Brea, California
<br />The IDEA team prepared conceptual and final construction documents for a one
<br />Years of Experience : mile segment of Class I meandering trail through an abandoned rail corridor
<br />28 : in Brea. Segment 3 included work between Brea Boulevard and State College
<br />i Boulevard and incorporates both hard and soft surface trail, native plantings,
<br />site furnishings, and a lighted parking area. Mr. Bethke was responsible for
<br />design of the trail alignment, materials, infrastructure and street improvements.
<br />Santa Clara River Trail, Phase ll, Santa Clarita, California
<br />Mr. Bethke served as assistant project manager for Phase II of the Santa Clara
<br />River trail project in the city of Santa Clarita. The trail serves as a multi -modal
<br />recreation trail for commuter bicycle, pedestrian and equestrian use. This project
<br />was a vital link in the Santa Clara River trail system that links the city of Santa
<br />Clarita with the Pacific Ocean in Ventura. 20
<br />South Fork River Trail, Phase IV, Santa Clarita, California
<br />Mr. Bethke served as project engineer for this 1.3 -mile recreational trail. This
<br />project involved coordination with numerous governing agencies for design
<br />compliance. Design of the project included grading, drainage, hydraulic analysis,
<br />and concrete structural design for elements within the Santa Clara River.
<br />Santa Clara River Trail, Phase III, Santa Clarita, California
<br />Mr. Bethke served as project manager for Phase III of the Santa Clara River trail
<br />project. He provided conceptual design, which included two alternate studies
<br />involving route alignment for an undercrossing at Bouquet Canyon Road and a
<br />route over an existing sanitation district outfall facility. Mr. Bethke prepared final
<br />construction documents, which included trail plan and profile, grading, drainage,
<br />hydraulic analysis, and concrete structural calculations.
<br />Kern River Trail Specific Plan, Kern County, California
<br />As lead engineer, Mr. Bathke was involved in the master planning for
<br />approximately 15 miles of multi -use trail along the Kern River from Bakersfield,
<br />east to the mouth of the canyon beyond Rio Bravo. Three separate alternatives
<br />were developed for the trail alignment including research for destination points,
<br />access, ingress, egress, rest stops, signage, trail surfacing, fencing, and mixed
<br />uses. The project included research and data collection, site analysis, project
<br />coordination and conflict resolution, a needs analysis, trail planning and design
<br />and the preparation of an Environmental Impact Report. The final report included
<br />such items as a Mission Statement, background data, coordination with other
<br />planning efforts, natural resources and trail facilities, trail development codes,
<br />design standards, signage, maintenance, and implementation.
<br />25L -34
<br />
|