Laserfiche WebLink
• The Final EIR, which includes the Draft EIR, for the proposed project. <br />• All written and verbal comments from the Draft EIR public meeting by agencies, <br />organizations, and interested parties during the Draft EIR public review comment period. <br />• All responses to Draft FIR written and recorded verbal comments. <br />The mitigation monitoring and reporting program. <br />• The reports, studies, and technical memoranda included or referenced in the Final EIR. <br />• All documents, studies, EIRs, or other materials incorporated by reference in the Final <br />EIR. <br />• The resolutions adopted by the City in connection with the proposed project, and all <br />documents incorporated by reference therein. <br />• Matters of common knowledge to the City, including but not limited to federal, state, and <br />local laws and regulations. <br />• Any documents expressly cited in these Findings. <br />• Any other relevant materials required to be in the record of proceedings by Public <br />Resources Code Section 21167.6(e). <br />D. CUSTODIAN AND LOCATION OF RECORDS <br />The documents and other material that constitute the record of proceedings on which these <br />findings are based, are located at the City of Santa Ana Public Works Office, City Hall, 20 Civic <br />Center Plaza, 3`d Floor, Santa Ana, CA 92701. The custodian for these documents is the City of <br />Santa Ana. This information is provided in compliance with Public Resources Code Section <br />21081.6(a)(2) and 14 California Code of Regulations Section 15091(e). <br />E. PROJECT SUMMARY <br />The proposed project entails the improvements and widening of Warner Avenue from Main <br />Street to Grand Avenue to a total of six lanes (three lanes in each direction) with related <br />improvements such as raised landscaped medians and parkway, wider sidewalks, dedicated bike <br />lanes, increased storm drain size, bus locations, and the undergrounding of existing utilities along <br />the project segment (see table below). <br />Proiect Cross - Section Detail <br />CEQA Findings of Fact -4- <br />Warner Avenue Improvements & Widening from Main Street to Grand Avenue Aug 2015 <br />75B -16 <br />Existing Conditions <br />Proposed Project <br />Travel lanes <br />4 <br />6 <br />Lane width <br />10 to 12 feet <br />11 -foot <br />Raised median <br />none <br />14 -foot <br />Bike lanes <br />none <br />5 -foot <br />Sidewalk & Parkway <br />4 to 10 feet <br />10 -foot <br />Total ROW <br />70 to 120 feet <br />110 feet <br />CEQA Findings of Fact -4- <br />Warner Avenue Improvements & Widening from Main Street to Grand Avenue Aug 2015 <br />75B -16 <br />