My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - RESO FOR EIR WARNER AVE WIDEN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
09/01/2015
>
75B - PH - RESO FOR EIR WARNER AVE WIDEN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2015 6:04:50 PM
Creation date
8/27/2015 5:32:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75B
Date
9/1/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and height of sound walls /walls shall be determined based on the conclusions of the <br />final acoustical report and the final pad elevations of the grading plan. All walls <br />determined to be necessary for noise mitigation by the final acoustical report shall be <br />incorporated into the final roadway construction plans. <br />Finding: Changes or alterations have been required in or incorporated into the project that avoid <br />or substantially lessen the significant environmental effect identified in the Final EIR. These <br />changes are identified in the form of a mitigation measure, presented above. Impact 5.8 -1 would <br />be less than significant with mitigation. The City of Santa Ana hereby finds that implementation <br />of the mitigation measure is feasible, and it is therefore adopted. <br />Impact 5.8 -2 Construction activities would expose sensitive uses to groundborne vibration <br />levels that would be perceptible and potentially cause architectural damage <br />at homes. <br />Facts in Support of Finding: Support for this environmental impact conclusion is fully <br />discussed starting on page 5.8 -16 of Section 5.8, Noise, of the Draft EIR. <br />Groundborne vibration would be generated by the proposed project during construction activities, <br />primarily during the demolition, grading, and foundation phases. At a distance of 25 feet, <br />vibration levels generated by a vibratory roller would exceed the FTA threshold and would have <br />the potential to cause architectural damage at existing structures. <br />Mitigation Measure <br />N -2 The use of vibratory rollers shall be prohibited within 30 feet of a residential <br />structure. If soil compacting is required within 30 feet of a residential structure, static <br />rollers shall be employed. <br />Finding: Changes or alterations have been required in or incorporated into the project that avoid <br />or substantially lessen the significant environmental effect identified in the Final EIR. These <br />changes are identified in the form of a mitigation measure, presented above. Impact 5.8 -2 would <br />be less than significant with mitigation. The City of Santa Ana hereby finds that implementation <br />of the mitigation measure is feasible, and it is therefore adopted. <br />Transportation and Traffic <br />Impact 5.10 -6 Project construction may require additional temporary safety measures to <br />assure safe routes to schools for elementary schools next to the project site. <br />Facts in Support of Finding: Support for this environmental impact conclusion is fully <br />discussed starting on page 5.10 -28 of Section 5.10, Transportation and Traffic, of the Draft EIR. <br />There are two schools next to the project site: James Monroe Elementary School at 417 East <br />Central Avenue along the south side of Warner Avenue near its intersection with Oak Street; and <br />Manuel Esqueda Elementary School at 2240 South Main Street at the northwest corner of the <br />intersection of Warner Avenue and Main Street. Temporary changes to roadway and intersection <br />configuration during project construction, including changes to crosswalks and pedestrian <br />crossing signals, may require additional, temporary safety measures for students and other <br />CEQA Findings of Fact -9- <br />Warner Avenue Improvements & Widening from Main Street to Grand Avenue Aug 2015 <br />75B -21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.