My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - RFP - GRAFFITI
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
09/01/2015
>
19E - RFP - GRAFFITI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2015 1:20:35 PM
Creation date
8/31/2015 12:22:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19E
Date
9/1/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I *:1:11 -3Yr_1 <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS FOR GRSC SERVICES <br />1-10101;1 =1AVH6i <br />INTENT <br />It is the intent of these specifications, terms, and conditions to describe Graffiti Removal Street <br />Cleaning (GRSC) Services being requested by the City of Santa Ana Public Works Agency (PWA). <br />The City intends to award a 2 year contract (with option to renew) to the proposer selected as the <br />most responsible proposer whose response conforms to the RFP and meets the City's requirements. <br />It is the intent of these specifications, terms, and conditions to procure the most environmentally <br />preferable services. <br />SCOPE <br />The services shall consist of providing proactive and reactive professional graffiti removal services <br />throughout the City of Santa Ana, specifically high quality workmanship that leaves no traces of past <br />vandalism. Contractor providing the service shall coordinate work with the appropriate governmental <br />agencies, City staff, private property owners, and /or tenants of properties of the project site(s). For <br />each service call from the community, the Contractor shall complete the requested graffiti removal <br />services within twenty -four (24) hours. In the event that a service call site from the community cannot <br />be abated within twenty -four (24) hours due to inclement weather, size of the site, or any other <br />reason, the Contractor shall notify the Project Manager and /or his /her designee with the status of the <br />site prior to the end of the twenty -four (24) hour timeline. <br />I. SPECIFIC REQUIREMENTS <br />Contractor shall: <br />a. Remove or paint over all types of graffiti in compliance with all Federal, State, and local laws at <br />locations in the City of Santa Ana. Contractor(s) shall provide all labor, materials, and equipment <br />necessary to perform graffiti removal services according to accepted industry standards. <br />b. Remove graffiti from public structures, visible from the right -of -way, including, but not limited to <br />i. Public buildings, monuments, and facilities, <br />ii. Street light poles, <br />iii. Traffic signal poles or controller boxes, <br />iv. Concrete structures (i.e. City -owned sidewalks, bridges, overpasses, and flood <br />channel facilities, etc.), <br />V. Guardrails, <br />vi. Traffic signs, <br />vii. City Parks and <br />viii. Trails. <br />c. Perform graffiti removal work on private structures. As authorized, remove graffiti from private <br />structures, visible from the right -of -way, including, but not limited to <br />i. Exterior walls, <br />ii. Fences, <br />City of Santa Ana GRSC Services RFP Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.