My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
09/01/2015
>
CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2018 12:00:28 PM
Creation date
9/1/2015 4:37:09 PM
Metadata
Fields
Template:
City Clerk
Date
9/1/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sean P. O'Connor <br />Sheppard, Mullin, Richter & Hampton LLP <br />September 1, 2015 <br />Page 4 of 4 <br />The Wells Fargo Bank Property <br />The City is committed to working with all property owners, including Wells Fargo, <br />regarding the impacts to property caused by the Project. Specifically with respect to the <br />Wells Fargo property, Table 4-2 of the FEIR states as follows: <br />"Reconstruction of curb return at southeast corner of Warner and Main per <br />the City's standard radius of 35 feet would affect the northwest corner of <br />the existing Wells Fargo Bank building. This would potentially require the <br />partial demolition and reconstruction of the building to accommodate the <br />curb return or the full acquisition of the parcel and demolition of the <br />building. If the building is modified to accommodate the curb return, a <br />partial take of the existing setback area along the parcel in front of the <br />building and parking lot would be required. This parcel was assumed as a <br />full take for the purpose of this study." <br />Therefore, full acquisition of the Wells Fargo property may not be required and <br />cannot be determined until ROW studies and final design are complete. Accordingly, <br />the City will work with Wells Fargo throughout the final engineering process to optimize <br />use of its property, if feasible. <br />Thank you for your interest in the Warner Avenue Widening Project and your <br />attention to these issues. Should you have any further questions or concerns, please <br />do not hesitate to contact the undersigned. <br />Sincerely, <br />SONIA R. CARVALHO <br />City <br />21 <br />cc: Fred Mousavipour, Executive Director <br />William Galvez, City Engineer <br />Jason Gabriel, Principal Civil Engineer <br />Kenny Nguyen, Senior Civil Engineer <br />SANTA ANA CITY COUNCIL <br />Miguel A. Pulido Vincent F. Sarmiento Michele Martnez Angelica Amezcua P. David Denavide, Roman Reyna Sal Trailed <br />Mayor Mayor Pro Tem, Ward 1 Want 2 Ward 3 Ward 4 Ward 5 Ward 6 <br />moulido(dsanla-anaoro vsamniento(a)santaana.om mndati 0ii.nta-ina.oro aamezcralasanta-aaaora gbiggi,desRion-ta-aria wa rrevna(dsanta one. wa stinaeroAsanta-inaom <br />
The URL can be used to link to this page
Your browser does not support the video tag.