My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE - 75B
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
09/01/2015
>
CORRESPONDENCE - 75B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 4:24:17 PM
Creation date
9/1/2015 4:40:57 PM
Metadata
Fields
Template:
City Clerk
Agency
Planning & Building
Item #
75 B
Date
9/1/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana Active Streets <br />Re: Warner Improvements <br />September 1, 2015 <br />Page 2 <br />• Comply with the Complete Streets Act by providing safe and accessible travel for bicyclists, <br />pedestrians, and wheelchairs through new bike lanes and wider parkway/sidewalks. <br />• Increase roadway safety and reduce accidents by removing left turn hazards. <br />• Design and construct Warner Avenue to be consistent with the City's General Plan Circulation <br />Element and MPAH. <br />• Alleviate traffic congestion and delays within the Warner Avenue project limits. <br />• Provide roadway capacity to accommodate existing and future traffic volumes. <br />• Minimize property acquisition including public facilities <br />• Improve stormwater drainage and water quality. <br />In order to choose an alternative that best meets the project's objectives, while minimizing impacts <br />to the community and environment, the project alignment must consider all roadway users <br />including the needs of pedestrians, bicyclists, transit riders and motor vehicle drivers. However, <br />the project must also be consistent with adjacent roadway segments. Conceptual designs such <br />as shared bus/bike lanes should not be implemented on a single mile of roadway, but rather must <br />be implemented as part of network of tied roadways. <br />If you have any questions or need additional information, I may be reached at (714) 647-5664 or via <br />email at igabrielCa�santa-ana.oro. <br />Sincerely, <br />Jason Gabriel, PE <br />Principal Civil Engineer <br />Public Works Agency <br />cc: Fred Mousavipour, Executive Director <br />William Galvez, City Engineer <br />Ryan Hodge, Assistant City Attorney <br />Kenny Nguyen, Senior Civil Engineer <br />SANTA ANA CITY COUNCIL <br />Miguel A. Pulido Vincent F. Sarmiento Michele Martinez Angelica Amezcua P. David Beni Roman Reyna Sal Tmajero <br />Mayor Mayor Pro Tem, Ward 1 Ward 2 Ward 3 Ward 4 <br />moufdoghanla-anaom vsarmieoAsanta-and ora mmartmeziylum -ana.or, aamezouansanla-ana oro dbenavides(Qsanta-mar ora 0 amja-anas Ward6 <br />nt <br />� I 0 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.