My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-051 - Certifying Final Environmental Impact Report
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2015
>
2015-051 - Certifying Final Environmental Impact Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2015 4:23:17 PM
Creation date
9/9/2015 4:15:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2015-051
Date
9/1/2015
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All of the street segments have undersized storm drains, except Grand Avenue to the railroad <br />tracks. The project- related drainage system improvements significantly reduce flooding by <br />increasing the capacity of underground storm drains. The project would include construction <br />of Water Quality Management Plan Best Management Practices for site design, structural <br />source control, and treatment control which would increase the quality of the stormwater and <br />runoff that flows into the drainage system. <br />IV. Conclusion <br />The City of Santa Ana has balanced the project's benefits against the project's significant <br />unavoidable impacts. For the abovementioned reasons, implementation of the Warner Avenue <br />Improvements and Widening from Main Street to Grand Avenue project would have <br />environmental, economic, and social benefits that outweigh the unavoidable adverse <br />environmental impacts of the physical development, and those impacts, therefore, are considered <br />acceptable in light of the project's benefits. The City finds that each of the benefits described <br />above is an overriding consideration, independent of the other benefits, that warrants approval of <br />the project notwithstanding the project's significant unavoidable impacts. <br />CEQA Statement of Overriding Considerations -5- <br />Warner Avenue Improvements & Widening from Main Street to Grand Avenue Aug 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.