My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11A - 2ND READ ORD SOLAR PERMITS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
09/15/2015
>
11A - 2ND READ ORD SOLAR PERMITS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2015 3:22:59 PM
Creation date
9/10/2015 1:18:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
11A
Date
9/15/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LS 8.10.15 <br />live loads associated with the system to the building foundation <br />ii. At the applicant's cost, verify to the applicant's reasonable <br />satisfaction using standard electrical inspection techniques that <br />the existing electrical system including existing line, load, ground <br />and bonding wiring as well as main panel and subpanel sizes are <br />adequately sized, based on the existing electrical system's <br />current use, to carry all new photovoltaic electrical loads. <br />(d) Review / Issuance Process. <br />An application that satisfies the information requirements in the checklist <br />pursuant to Section (c)(2) above, shall be deemed complete. Upon <br />receipt of an incomplete application, the building official shall issue a <br />written correction notice detailing all deficiencies in the application and <br />any additional information required to be eligible for expedited permit <br />issuance. <br />2. Upon confirmation by the building official of the application and <br />supporting documentation being complete and meeting the requirements <br />of the checklist, the building official shall administratively approve the <br />application and Issue all required permits. <br />3. City building permit approval does not authorize an applicant to connect <br />the small residential rooftop energy system to the local utility provider's <br />electricity grid. The applicant is responsible for obtaining such approval <br />or permission from the local utility provider. <br />(e) Inspections. <br />1. For a small residential rooftop solar energy system eligible for expedited <br />review, only one inspection shall be required. <br />2. If a small residential rooftop solar energy system fails inspection, a <br />subsequent inspection is authorized; however the subsequent inspection <br />need not conform to the requirements of this subsection. <br />SECTION 4. If any section, subsection, phrase, or clause of this ordinance is for any <br />reason held to be unconstitutional, such decision shall not affect the validity of the remaining <br />portions of this ordinance. The City Council hereby declares that it would have passed this <br />ordinance and each section, subsection, phrase or clause thereof irrespective of the fact <br />that any one or more sections, subsections, phrases, or clauses be declared invalid or <br />unconstitutional. <br />11 A -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.