Laserfiche WebLink
Santa Ana Police DIMS Server Trade -in & Upgrade <br />Eaninmcut Phdse Ouanilty unit Extended <br />t200XRDIMS Database Case Management Decoding ImageServer Rackmoant 48,10T6 9 <br />DIMS RAID 6 CMS 2U rack chassis w/ redundant -50OW power supplies <br />1 <br />$13,500.00 <br />$13,500.00 <br />48,0Ti3 RAID 6 <br />1 <br />$0.00 <br />$0.00 <br />12.0'fB auto hot spare auto rebuild (48.OT5 total drive capacity 36.OTB usable) <br />1 <br />$0.0) <br />$0.00 <br />6.OTB RAID certified server class high speed hard drives <br />1 <br />$0.00 <br />$0.00 <br />RAID controller w/ write cache battery backup module <br />1 <br />$0.00 <br />$0.00 <br />IOGb Ethernet NIC Intel <br />0 <br />$995.00 <br />$0.00 <br />* ** Required: Cat 6a or Class F /Cat 7 cables & Fibre Channel to copper transceiver <br />0 <br />$0.00 <br />$0.00 <br />DIMS Storage Solution O/S <br />1 <br />$0.00 <br />$0.00 <br />DIMS Extended Dynamic Volume Allocution Array Module <br />1 <br />$0.00 <br />$0.00 <br />Installation @ Linear <br />1 <br />.$1,000.00 <br />$1,000.00 <br />" ** This is a hardware only upgrade using existing O/S & database <br />I <br />Dlgrlat ti »rmatlan tt( mragonjeretS Solr`_�ilina_ &eSex verPaNSgjceAreGive�`*'* w � ��'7: <br />'uxtefhR¢r/un�ntiY_eAwarkSNrQym <br />NLS- 6t00XR DIMS Databnse Case Mmmg¢ment Decoding ImageSever Rackmount 48.0113 �ka8e'�I.... � <br />Linear trade -in discount for old hardware (also includes Market Development Funds 2014) <br />� n <br />� *� <br />DIMS RAID 6 OAS 2U rack chassis w/ redundant 50OW power supplies <br />I <br />$13,500.00 <br />$13,500.00 <br />48.016 RAID 6 <br />1 <br />$0.00 <br />$0.00 <br />12.OTB auto hot spare auto rebuild (48AT6 total drive capacity 36.OTB usable) <br />1 <br />$0.00 <br />$0.00 <br />6.OTB RAID certified serverclass high speed Bard drives <br />1 <br />$0100 <br />$0.00 <br />RAID controller w/ write cache battery backup module <br />1 <br />$0.00 <br />$0.00 <br />tOGb Ethernet NIC Intel <br />0 <br />$995.00 <br />$0.00 <br />* ** Required: Cat 6a or Class F /Cat 7 cables & Fibre Channel to copper transceiver - <br />0 <br />$0.00 <br />$0.00 <br />DIMS FailSafemulti -user case management database (redundandin cored) <br />I <br />$5,0W.00 <br />$5,000.00 <br />DIMS Storage Solution O/S <br />1 <br />$0.00 <br />$0.00 <br />.,.,..:..: D1NL5; Ea[ endedRynwvic. Ynlmne6111neattou .Aviry_MOdule:_,_:__ ____,_,_ - -- <br />I <br />- SO..00. -._ <br />�.SOAO <br />installation @Linear <br />1 <br />$1,000.00 <br />$1,000.00 <br />* ** This is ahardware only upgrade using existing O/S & database <br />.J ` 4Y DIVISION <br />sl o. zl'rcar- scstum.unn <br />200XR DIMS Database Case Management Decoding ImageServer Rackmount 48.016 <br />arvsom It3e Pat <br />Total <br />DIMS RA [D 6 CMS 2U rack chassis w/ redundant 50OW power supplies - <br />1 $13,500.00 <br />$13,500,00 <br />48.OIB RAID 6 <br />1 $0.00 <br />$0.00 <br />13.01`13 auto tat spare auto rebuild (48 -OTB total drive capacity 36.0'rB usable) <br />1 $0.00 <br />$0.00 <br />6.0113 RAID earn tied server class high speed hard drives <br />1 $0.00 <br />$0.00 <br />RAID controller w/ write cache battery backup module <br />1 $0.00 <br />$0100 <br />DIMS Storage Solution O/S <br />1 $0.00 <br />$0.00 <br />DIMS Extended Dynamic Volume Allocation Array Module <br />1 $0.00 <br />$0.00 <br />installation @ Linear <br />1 $1,00000 <br />$1,00000 <br />Installation, Integration, calibration, testing, & QC <br />MaNdays onsite per day including travel Zone:71 (adjust as needed) <br />1 $1,000.00 <br />$1,000.00 <br />MaNdays multiple site onsite per day Zone N ( adult as needed) <br />0: IISOR00 <br />$0,00 <br />Supervised remote access software support & upgrades (Internet access required) <br />1 $0.00 <br />$0.00 <br />* *" Installation does not include offst e For Ac uisition Stations at area commands <br />- - h „ <br />v <br />< a ,Sliw <br />$49,500.00 <br />Linear trade -in discount for old hardware (also includes Market Development Funds 2014) <br />is I y500100) <br />No Enrors& Omissions Coverage <br />No $0.00 <br />Subtotal <br />$34,000.00 <br />Sales Tax <br />8.00% $2.400.00 <br />Shipping <br />$0.00 <br />$36,400.00 <br />* ** New equipment will be shipped In advance for data transfer. * ** <br />*'** This pricing is based on "Sole Source" procurement. IF this purchase requires a RFP, pricing <br />will be higher. * ** <br />Approximate $15,500.00 <br />*'*Estimation or RFP costs (man days & contracts) add to cost (not sole source). <br />* ** All listed capacities assume LOTS= 1,000,000,000,000 bytes. *** <br />°•"* Systems will he covered under the exi0ing maintenance contract with the city. " *" <br />Options <br />* ** 3rd repository is highly recommended fur storrtge solo douse e•?4.Ifro. * ** <br />Linear will charge additional fees if Clty /Cou1u)=5(vte levies fees for Busmoss License or sales <br />tax, * ** <br />Linear Systems if SYSTEMS <br />LINEAR SYSTEMS <br />Melissa Dutkevitclr <br />Volitional]: 7122015 <br />Rancho Cucamonga, CA <br />wcassadarrear-evstemsco" <br />Terns: N -30 <br />909.899 -4345 T+ E - <br />909- 899 -4346 fax LANv NEORCEMCNT 11.1,w1: <br />Johnny Flentsch <br />Ship Via: Track <br />GSA 9: GS- 35F- 05471: <br />.J ` 4Y DIVISION <br />sl o. zl'rcar- scstum.unn <br />25D -6 <br />