My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (28) - 2015
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (28) - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2015 10:35:47 AM
Creation date
9/29/2015 10:15:50 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
Contract #
A-2015-127
Agency
PUBLIC WORKS
Council Approval Date
7/7/2015
Expiration Date
6/30/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.1 Authorization to Construct <br />In the event the Public Way Use Agreement is not in place prior to the initiation of <br />construction activities, OCTA is authorized to advance construction activities, contingent <br />upon the Santa Ana's approval of design plans and authorization of construction permits. <br />Santa Ana shall not unreasonably withhold approvals or construction permits if OCTA has <br />met Santa Ana's existing standards and regulations. Unless related to public safety, the <br />City's standards shall be those in place at the beginning of design. <br />SECTION 8 OPERATIONS & MAINTENANCE <br />This Section is intended to provide an understanding of general terms and conditions <br />between the Parties for the operations and maintenance of the Streetcar System within <br />the jurisdiction of Santa Ana. An Operations and Maintenance Agreement shall in good <br />faith be developed between the Parties to define in detail the roles, responsibilities, and <br />expectations regarding the operations and maintenance of the Streetcar System and <br />adjacent Santa Ana facilities for as long as the Streetcar System is providing service as <br />intended. Topics to be addressed in detail in the Operations and Maintenance Agreement <br />shall include, but not limited to, the following: <br />Operations <br />• System Operations <br />• Streetcar/Traffic Signal <br />Coordination <br />• Adjacent City Facilities <br />• City Access to Streetcar Track <br />Area <br />• Right of Way Permits <br />• Fire /Life /8afety /Security <br />Coordination <br />• Emergency Procedures <br />• Emergency Drills <br />• Emergency Access <br />• Fare Collection <br />• Special Events <br />• Displays and Attachments <br />• Advertising <br />• OCTA Operating Costs <br />• City Operating Costs <br />• Service Agreements <br />• Fare /Revenue Policies <br />Maintenance <br />• Protection of Adjacent Facilities <br />• Notice and Approvals <br />• OCTA Maintenance <br />Responsibilities <br />• City Maintenance Responsibilities <br />• Lighting <br />• Track <br />• OCS <br />• Traction Power <br />• Structures <br />• Pavement <br />• Street Lights <br />• Artwork <br />• Storm Drainage <br />• Utilities <br />• Maintenance Costs <br />• Service Agreements <br />Track Access Permit Procedures <br />• Permit Process <br />• Training <br />• Safety <br />General Conditions <br />Streetcar SVstem Map <br />14 <br />L: \Camm\ CLERICAL \WORDPROC \AGREE \ag53295 SA OCTA MOU_Final 06.30.2015MOU.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.