My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - PLAN CHECK SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
10/06/2015
>
25D - AGMT - PLAN CHECK SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2015 3:23:23 PM
Creation date
10/1/2015 3:20:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
25D
Date
10/6/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Check Service Agreements <br />October 6, 2015 <br />Page 2 <br />In the accelerated plan check process, the applicant submits the plans to the City along with a <br />request for accelerated plan check, The applicant then pays the regular plan check fee as well <br />as an accelerated fee which is based on the City's estimated number of hours required to check <br />the plans. The plans are then sent to the consultant with a guaranteed turnaround time of 15- <br />working days. This process benefits the applicant by providing an option to expedite plan check <br />for large, complicated and /or urgent projects. <br />Sustained growth from the building industry combined with current turnaround times for regular <br />(non - accelerated) plan check exceeding seven weeks has resulted in an increasing number of <br />projects requesting accelerated plan check. Building activity has continued to increase this past <br />fiscal year with many projects choosing to accelerate the plan review process. Due to the number <br />and size of accelerated projects last year, including large projects such as 1901 East First Street <br />and 301 Jeanette Lane, contract funds have expended quickly. It is anticipated that building <br />activity will remain at a high level and the renewal of these contracts would allow for the <br />expedited customer service through plan check services that the building community is <br />requesting. <br />The Building Safety Division released a Request for Proposals on May 14, 2014 and received <br />proposals from five firms. Based on a review of the qualifications, experience of personnel, <br />demonstrated ability to meet the specified turnaround times and price, staff is recommending that <br />the City enter into agreements with four out of the five structural plan check consultants. Scott <br />Fazekas & Associates; Inc., CSC Consultants, Inc„ Century Structural Engineering Co., Inc., and <br />J Lee Engineering Inc. have contracted with the City for expedited plan check services in the past <br />and were able to continually meet the City's requirements for availability of qualified engineering <br />staff, turnaround time, iocale, and fees. Each of these firms is well -known in the structural <br />engineering field and has experience working with municipalities for on-call plan cheek services. <br />The recommended firms offer both full and structural only plan check services at a competitive <br />rate of 40 percent of the plan check fee calculated by the City and will process any required plan <br />revisions and deferred submittals on a tiered rate system ranging from $85 to $100 per hour <br />depending on the complexity lever of the revision and plan check personnel assigned to the <br />review. Accelerated plan check fees are paid entirely by the applicant. <br />The increased number of available firms to send out accelerated plan checks will provide greater <br />flexibility for the Building Safety Division to both ensure that plans are reviewed within the <br />specified time frames; as well as route projects to firms that may specialize in a specific building <br />type or construction method, <br />STR61EGiC ELAN ,j ENT <br />Approval of this item supports the City's effort to meet Goal #3 Economic Development, Objective <br />#3 (promote a solutions -based customer focus in all efforts to facilitate development and <br />investment In the community). <br />25D -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.