Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT N0, 14 -6439 <br />BRISTOL STREET WATER MAIN REPLACEMENT <br />16 <br />Cut and Cap Existing Waterline <br />21 <br />EA <br />$ 6oO, ` <br />$ f'Z 6OM <br />17 <br />Remove Existing Fire Hydrant <br />19 <br />EA <br />$ 76'0, 'S <br />$ <br />18 <br />Abandon Existing Valve <br />37 <br />EA <br />$ ,` i. °4 <br />$ f 3 56a <br />r 19 <br />Remove and Dispose of Existing Valve <br />11 <br />EA <br />$ 6WY "" <br />$ 6 00 <br />20 <br />Abandon Existing Main in Place <br />1 <br />LS <br />$ 2 gee, n <br />$ 2Sj 000v = <br />21 <br />_ <br />2" Combination Air Vacuum Release <br />Assembly <br />5 <br />EA <br />$3SU6. <br />$ /7 v�. <br />�s <br />22 <br />4" Blow Off Assembly <br />8 <br />EA <br />$ L /5� `s <br />$ 3b, 000, <br />23 <br />Connect New Pipeline to Existing <br />18 <br />EA <br />$ ?,0 c•s <br />$ 5z/, 0<yo'° -°, <br />24 <br />Connect to Existing Concrete Cylinder Pipe <br />1 <br />EA <br />$ Z 000. <br />$ -(� 00CX• nr <br />25 <br />Replace Traffic Detector Loops <br />76 <br />EA <br />ky xn, == <br />$ 38, (oo. a4 <br />26 <br />Signing and Striping <br />1 <br />LS <br />$1s;aCe" <br />$ ZS,(ve. <br />27 <br />As -Built Drawings <br />1 <br />LS <br />$30,000 <br />$30,000 <br />28 <br />OPTIONAL Vertical Offset <br />4 <br />EA <br />$ 5 (Jcx3 <br />$ V, Ocp q <br />�u TOTAL BASE BID ITEMS 1 -28 — <br />$ Z, 5o (, /W <br />The lowest responsible bidder shall be selected based on the BASE BID Amount. The City <br />reserves the right to award the Base Bid, and any, all or none of the alternate Bid Items. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete said work within one hundred (100) <br />working days after the commencement date stated in the Notice to Proceed. The bidder also <br />proposes to commence construction of the Work within thirty (30) calendar days after issuance <br />of a Notice To Proceed, and to continue in a diligent and workman -like manner without <br />interruption, and to complete the construction thereof within the time specified above. <br />The liquidated damages amount, in lieu of that specified in Subsection 6 -9 of the Standard <br />Specifications, shall be $1000 per calendar day. <br />P-1 c' <br />Scolinn 3 - n Pmpoe1109- 1S�SOIA dnep <br />23A -10 <br />