My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AGMT - WASTE DISCHARGE SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
10/06/2015
>
25G - AGMT - WASTE DISCHARGE SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2015 4:43:07 PM
Creation date
10/1/2015 4:16:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
10/6/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
; ow- � <br />n <br />ENVIRONMENTAL <br />2015 Fee Schedule <br />PERSONNELCHARGES <br />The charge for all time required for the performance of <br />the Scope of Work, including office, field and travel <br />time, will be billed at the hourly rate according to the <br />labor classifications set forth below: <br />Labor Classification Hourly Rate <br />Staff Engineer/Geologist/Scientist <br />$115 <br />Sr Staff Engineer /Geologist /Scientist <br />$125 <br />Project Engineer /Geologist/Scientist -1 <br />$150 <br />Project Engineer /Geologist/Scientist - It <br />$160 <br />Sr Project Engineer /Geologist/Sctentist -1 <br />$180 <br />Sr Project Engineer /Geologist/Scientist -11 <br />$200 <br />Principal Geologist <br />$225 <br />Principal <br />$225 <br />Project Assistant <br />$90 <br />Technician <br />$90 <br />Drafter <br />$110 <br />Sr Technician <br />$105 <br />Compliance Inspector <br />$105 <br />Analyst GIS/Technology <br />$95 <br />Sr Analyst GIS/Technology <br />$105 <br />Specialist GIS/Technology <br />$115 <br />Sr Specialist GIS/Technology <br />$125 <br />Supervisor GIS/Technology <br />$145 <br />Director /GIS Technology <br />$160 <br />Construction Technician <br />$75 <br />Construction Field Supervisor <br />$95 <br />Construction Manager <br />$100 <br />Sr Construction Manager <br />$125 <br />Technical Editor <br />$95 <br />Emergency response and client requested work during <br />non - standard business hours will be charged <br />at a rate <br />of 1.25 times the standard hourly rate. <br />Travel <br />Vehicles used on project assignments will be <br />charged at $50 per day. Mileage is billed at the <br />current rate established by the Internal Revenue <br />Service plus mark up. Per Diem is billed at a unit <br />cost of $50 per day. Airfare, lodging, rental cars and <br />associated expenses are billed at cost plus mark up. <br />Field Equipment <br />Field Equipment Is billed at standard unit costs. <br />Rate schedules are available upon request. <br />Subcontractors and Reimbursabies <br />The costs of subcontractors, materials, equipment <br />rental and costs incurred will be charged at cost <br />plus 15 %. <br />they Project Charges <br />The cost of additional report reproduction and <br />special project accounting will be billed as <br />appropriate. Plotting plans are charged by size, <br />black and white or color, and by the number of <br />copies supplied. <br />Shlonino and Postaoe <br />Shipping charges include couriers and the postage <br />necessary will be charged at cost plus markup. <br />Interest Charges <br />Interest on late payments will be charged at the rate <br />of 1.5% per month. <br />When EEC Staff appear as expert witnesses at court <br />trials, mediation, arbitration hearings and depositions, Payment Terms <br />their time will be charged at 2.0 times the standard Net 30 days apply to all work performed and <br />rate. All time spent preparing for such trials, hearings, invoiced unless superseded by a specific executed <br />and depositions, will be charged at the standard hourly contract. <br />rate. <br />This roe Schedule is adjusted earh subamnent year to reflect the economic changes rot (lie new year. The new schedule will apply to existing <br />arid new assignments. <br />25G -53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.