Laserfiche WebLink
8. The permit applicant shall provide a coverage and cell site location map <br />for each existing and proposed facility in Santa Ana. <br />9. Locate all equipment and related appurtenances (appleton plug and <br />electric meter) on the inside of the existing equipment enclosure or inside <br />the building and underground all electrical power from the utility source <br />shown on the approved site plan. <br />10. Conditional Use Permit No. 2014 -52 expires 10 years from the date of City <br />Council approval. <br />Resolution No. 2015 -31 <br />31A-21 Page 7 of 7 <br />