Laserfiche WebLink
Answer: <br />a) No, the bid items do not include the construction of the 6 -inch thick PCC Pavement for <br />water line trenches. The final PCC paving of the water trenches is included in the bid <br />item 98 of the proposal. <br />b) No, these areas are localized areas on the same street, but are not part of the water <br />main construction. <br />All other terms and conditions remain the same. <br />FOR THE CITY OF SANTA ANA <br />AITEdwin I lam" Gal ;. _. <br />City E meer <br />SANTA ANA CITY COUNCIL, <br />Miguel A. Polido i BaDma.. ! Vffi.nl F, Barmlanlo I MMale MA11noz Angellaa Amen.. 1 P. David Benevides Romon Raynn <br />Mayor Mayor Pro Tam, Ward 1 Werd1 ! Ward 1 Ward3 Ward4 1 Wan15 <br />Bgdo[itl.5�12-agaggr STlna'erofolsanta-ar,a orgVSgl�j,@p ny,[)q s(Pi aana.oYq MM 1' tID digs§pa;p(fy ua„�s8r,�q;ypa gry ! OgigCisfcas®pla-ane am ! R[jgVn sante-ayy@�.op <br />