My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PALP INC. DBA EXCEL PAVING COMPANY (4)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
PALP INC. DBA EXCEL PAVING COMPANY (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:10:54 PM
Creation date
10/5/2015 9:31:26 AM
Metadata
Fields
Template:
Contracts
Company Name
PALP INC. DBA EXCEL PAVING COMPANY
Contract #
Various
Agency
Public Works
Council Approval Date
6/16/2015
Insurance Exp Date
6/1/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGNATIONICERTIFICATION OF ASPHALT-RUBBERAND AGGREGATE MEMBRANE <br />CONTRACTOR AND/OR SUBCONTRACTOR(S) <br />Bidder proposes to have the ARAM installed by: <br />Manhole Adjusting, Inc. <br />This section shall be completed even if the apparent low bidder plans to produce and install <br />ARAM with its own forces. Name of Contractor and/or Subcontractor(s) shall be the actual <br />company(ies) applying the binder and aggregate. <br />For any bid to be considered responsive, performance criteria must be demonstrated on five <br />separate projects performed by the same contractor or subcontractor(s) designated above, and with <br />equivalent aggregate and binder proposed for the ARAM in this bid. Two years shall have elapsed <br />since completion of the ARAM surface on each project and the projects shall be located in <br />Southern California. To be considered a valid representative project, bidder must submit the name <br />of the project, owner agency, agency representative's name and phone number, and a list of streets <br />with limits totaling at least 1 mile (based on full width) in length for each project and the date the <br />project was actually performed. A project will be considered a valid representative project if an <br />asphalt emulsion spray application was originally placed with or without an application of sand, <br />within 15 calendar days of the application of ARAM. Any other cover coat or course on the <br />ARAM will cause the ARAM to be considered invalid as a representative project. ARAM on all <br />projects must show insignificant raveling (loss of rock) and insignificant flushing (binder <br />migration to the surface) at time of inspection by the Agency. Bidder shall verify any proposed <br />representative projects prior to listing a subcontractor with such projects, or the bid will be <br />considered non-responsive. If the Bidder cannot list in the space provided five projects that meet <br />the criteria specified herein that were performed by the proposed ARAM contractor or <br />subcontractor(s), the bid shall be considered non-responsive. <br />
The URL can be used to link to this page
Your browser does not support the video tag.