Laserfiche WebLink
CITY OF SANTA ANA <br /> PUBLIC WORKS AGENCY <br /> fF .< <br /> CONTRACT CHANGE ORDER <br /> Project Number Project Nos. 15-6836 & 15-6452; Residential Street Change Order Number 1 <br /> Repair FY 14/15 & Wilshire and Borchard Water Main <br /> Improvements <br /> To Excel Paving Company <br /> Contractor <br /> You are hereby directed to make the herein changes from the plans end specifications or do the following described work not included in the plans and <br /> specifications on this contract. <br /> NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br /> Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by PUBLIC WORKS AGENCY <br /> 15-6836: Residential Street Repair FY 14/15 &Wilshire <br /> 1.1 EXTRA WORK AT AGREED PRICE <br /> Remove existing and construct crossgutter, curbs, sidewalks and two wheelchair ramps; and <br /> relocate pull boxes and pedestrian push button poles at Dyer Road and Pullman Street per PCO <br /> #12. <br /> AGREED PRICE = $84,785 <br /> 1.2 EXTRA WORK AT AGREED PRICE <br /> Install thermoplastic stripping and paint red curb at Dyer Road and Pullman Street per PCO #11. <br /> AGREED PRICE = $1,000 <br /> 1.3 EXTRA WORK AT TIME & MATERIALS <br /> Perform additional survey at concrete intersection per PCO #8. <br /> TOTAL COST = $3,067 <br /> 15-6452: Wilshire and Borchard Water Main Improvements <br /> 1.4 EXTRA WORK AT TIME & MATERIALS <br /> Extend 1" Water Service line on private property at 411 West Wilshire Avenue per PCO #2. <br /> TOTAL COST =$2,200 <br /> 1.5 EXTRA WORK AT AGREED PRICE <br /> Install water line stop at Parton St. & Russell Ave. and replace a broken gate valve at Wilshire & <br /> Parton per PCO #4. <br /> AGREED PRICE = $26,375 <br /> Page 1 of 3 <br />