My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - VARIANCE - 1760 E EDINGER AVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
10/20/2015
>
31A - VARIANCE - 1760 E EDINGER AVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2015 5:52:37 PM
Creation date
10/15/2015 5:26:33 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31A
Date
10/20/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VA No. 2015 -06 <br />September 28, 2015 <br />Page 4 <br />To analyze whether the existing parking on the site could accommodate the use, and therefore <br />substantiate the variance request, the applicant hired the traffic engineering firm of Linscott Law & <br />Greenspan to provide an alternative parking standard for the health club, and to prepare a shared <br />parking analysis of the site, and study the impacts on other commercial centers that share similar <br />multiple land uses. Using procedures developed by the Urban Land Institute (ULI) for shared parking, <br />hourly demand profiles for a typical non - holiday week were applied for the four relevant land uses <br />(retail, family restaurant, fast -food restaurant and fitness center), For this study a ratio of 5.5 spaces <br />per 1,000 square feet was used to account for the unique trip making and parking characteristics of <br />the health club based on actual field studies of other health club operations. Note that while the <br />sample health clubs varied in overall building size, the ratio of "physical activity" space to "ancillary" <br />(lockers, lobby, hallways, etc.) space was similar to the proposed Planet Fitness, with range of 60 to <br />68 percent of "physical activity' space per fitness center. <br />Based on further analysis, PacifiCenter's overall peak requirement, assuming full occupancy and <br />completion of the proposed Planet Fitness project, is at 6:00 p.m. during the weekday with a forecast <br />of 775 parking spaces. On the weekend, the peak parking requirements for PacifiCenter will occur at <br />5:00 p.m. when a parking demand of 775 spaces is forecasted (Exhibit 9). The parking study took <br />into the account the restriping and the four displaced parking spaces included in the site remodel <br />when calculating the potential surplus parking for the center. Thus, based on the shared supply of <br />856 parking spaces, a surplus of 81 spaces would result during weekday and weekend peak hours. <br />Since 2000, the City has considered similar request for parking variance for health clubs in five <br />different locations in Santa Ana: Bally Total Fitness (now LA Fitness) at 3701 South Plaza Drive, LA <br />Fitness at 1501 North Tustin Avenue, Gold's Gym at 1945 East Seventeenth Street, Planet Fitness at <br />2725 North Bristol Street, and 24 Hour Fitness at 2800 North Main Street. Parking variances at these <br />locations were approved with reduction in parking of approximately 30, 31, 51, 50 and 20 percent <br />respectively. <br />In analyzing the variance request staff must be able to show that findings can be made that support <br />the criteria listed above. <br />The project site has a special circumstance related to its size, shape and location. The proposed <br />use will be located within a built -out commercial center on Edinger Avenue that is a major <br />transportation corridor and surrounded by commercial, office and light industrial uses. Due to its <br />location, there is no feasible option to providing additional parking the Santa Ana Municipal Code <br />requires for a health club. The number of on -site parking spaces will be sufficient as identified in <br />the parking analysis for the project, which has determined that a surplus of parking will be <br />provided for the project given the dynamic of shared parking on -site. As a result, the parking <br />variance will allow the applicant the ability to use the property in a manner that is consistent with <br />similar surrounding commercial community serving uses. <br />31A-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.