My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - GRAFFITI SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
10/20/2015
>
25H - AGMT - GRAFFITI SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2015 6:24:37 PM
Creation date
10/15/2015 6:20:23 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25H
Date
10/20/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vii. Signs; <br />viii. Bus stops and shelters; <br />ix. News racks; <br />X, Doors; and <br />X!, Flag poles. <br />Work on private property shall not be performed without the Consent form signed by the owner or <br />authorized by the Project Manager and /or his /her designee. A sample of the Consent form is <br />provided as Attachment 1. The contractor shall obtain the signature of the property owner on the <br />consent form prior to beginning work. Original consent forms shall be returned to the Project <br />Manager and /or his /her designee on a weekly basis and are the property of the City. <br />d. City Parks <br />At the City's discretion, if funded and approved, Proposer will remove graffiti in the Parks not <br />visible from the right -or -way, including, but not limited to: <br />i. Restrooms — Interior and Exterior; <br />ii. Park Exterior Facilities (snack bars, storage closets, rec. buildings); <br />Iii. Concrete structures (Le, sidewalks, paths, bridges, trails); <br />iv. Bike Paths; <br />V, Walking Paths; <br />vi. Bleachers; <br />vii. Baseball /Softball Diamonds; <br />viii. Trash Receptacles; <br />ix. Rocks; <br />X, Doors; <br />xl. Fences; <br />xii. Windows; <br />xiii. Utility boxes and covers, and <br />xiv. Park Trees; <br />The above work will be priced separately from the Pricing Section Grand Total Price in Exhibit B. <br />e. Unless notified otherwise by the Project Manager and /or his /her designee, graffiti shall be <br />removed so no trace of the pre - existing graffiti remains. <br />f. Protect the surfaces adjacent to the area to be abated. <br />g. Abate the entire surface in the event that the graffiti rovers a significant area of the surface. Tile <br />Project Manager or his /her designee shall determine whether or not an entire surface will be <br />abated on a case by case basis. <br />h. Ensure protection of the work area at all times, including, but not limited to: <br />I. Barricade the area of work at safe distances, so as to prevent unauthorized access to <br />the area; <br />ii. Barricade area of work within the public right -of -way; <br />iii. Using warning signs and safety cones to inform the public of work being conducted; <br />iv. Immediately correct damage to the work site; <br />V. Leave work site in undamaged condition; <br />vi. Post signage to Identify wet paint; <br />vii. Remove all equipment and materials when leaving work each day. <br />viii. Dispose of all packaging, containers and excess materials in accordance with <br />applicable laws, regulations, ordinances, codes, and any other legislative or statutory <br />25H -13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.