My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - GRAFFITI SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
10/20/2015
>
25H - AGMT - GRAFFITI SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2015 6:24:37 PM
Creation date
10/15/2015 6:20:23 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25H
Date
10/20/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii. Before and after photos; <br />iii. Date and time of work order creation; <br />iv. Date and time of removal performed; <br />V. Response time in hours; <br />vi. City department; <br />vii, City contact name; <br />viii. Date and time of request; <br />Ix. Date and time of work performed; <br />X. Square footage; <br />X!, Surface type; <br />xi]. Pubic or private property; <br />Kill. Brief description of graffiti; <br />xiv. Description of remedy, and <br />xv. Gang tag ID <br />c. Work order system shall include personalized and secure client logins, and City personnel may <br />monitor City work orders and projects. <br />d. Location shall include a Global Positioning System (GPS) link attached to Google or other <br />commonly used online mapping application. <br />e. Web based system must be able to show: <br />]. All work order status; <br />Ii. Maps of zones as provided by City; <br />ill. Response time to work orders; <br />iv. Costs by zones; <br />V. Square footage cleaned by zones; <br />vi. Custom graphs and reports to include but not limited to; <br />vii. Total Locations received from Graffiti Hotline; <br />viii. Total Location received from App <br />ix. Total Square Footage Removed <br />X, Average response time for service calls through Graffiti Hotline /App <br />1. Same Day Response <br />2. Within 24 Hours <br />3. Within 48 Hours <br />4. Over 48 Hours and /or referred to other Agencies <br />xi. Maps in Google Earth; <br />The City shall have access to this data following completion of the work order for a period of three <br />years. <br />g. All data collected In the database for this project is the property of the City of Santa Ana. <br />III, MOBILE APPLICATION TOOL <br />a. Contractor shall provide a mobile application free for City personnel and the general public. <br />b. This application shall allow for the submission of photos of graffiti electronically into Contractor's <br />Work Order System. <br />c. Reporting party shall automatically receive an electronic response with all before and after photos <br />once the work has been completed. <br />d. This application shall be available on IDS and Android platforms, including, but not limited to Apple <br />]Phone and Google Android mobile devices. <br />25H -15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.