My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAGLE ENGINEERING & DEVELOPMENT, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
EAGLE ENGINEERING & DEVELOPMENT, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2016 4:19:14 PM
Creation date
10/19/2015 1:32:56 PM
Metadata
Fields
Template:
Contracts
Company Name
EAGLE ENGINEERING & DEVELOPMENT, INC.
Contract #
Various
Agency
Public Works
Council Approval Date
6/16/2015
Insurance Exp Date
1/1/1900
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />11 rroil 11 <br />N • <br />Project No. 14-6801: McFadden Avenue from Newhope Street to Harbor Boulevard <br />Project No. 1.4-6804: Civic Center Drive from Main to Spurgeon Street <br />Project No. 14-6811: Memory Lane from. Main Street to North City Limit <br />Item <br />Description <br />Unit <br />Qty <br />unit <br />Price <br />Amount <br />Alli) ALTERNATE #1 (Includes All Three Projects) <br />37 <br />Bike Lane Legend (Exhibit 1, Detail "A") <br />EA <br />8 <br />870.42 <br />6963 <br />38 <br />Bike Lane Merge Area Legend (Exhibit 1, Detail "F") <br />EA <br />19 <br />2588.09 <br />49174 <br />39 <br />Bike Lane Buffer Addition (Exhibit 1, Detail) <br />LF <br />81000 <br />10.78 <br />6240 <br />TOTAL ADD ALTERNATE #1 (Includes All Three Projects) <br />62,337 <br />**TOTAL BASE BID (Includes All Three Projects) <br />1,289,232.09 <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25%" <br />limit as stated in Section 3-2 of the Standard Specifications, The actual amount for this item will be dictated by the <br />actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. <br />This bid item is considered deletable per Section 3-2.5 "Eliminated Items" of the Standard Specifications. <br />This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications. <br />**The lowest responsible bidder shall be selected based on the lowest responsive TOTAL BASE BID. <br />The City reserves the right to award the Base Bid and any, all, or none of the Add Alternate Bid items. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder shall complete all work in the contract and for all three projects, within a <br />total of one hundred ten (I 10) working days after the commencement date stated in the Notice to <br />Proceed. Projects shall be constructed in the following order and (#) working days per project: <br />1) McFadden (50 working days), 2) Memory Lane (35 working days), & 3) Civic Center (25 working days) <br />The bidder also proposes to commence construction of the Work within ten (10) working days <br />after issuance of a Notice to Proceed, and to continue in a diligent and workman -like manner <br />without interruption, and to complete the construction thereof within the time specified above. <br />The liquidated damages amount in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $2.9.00 per calendar day. <br />Name of Firm Eagle Engineering & <br />Signature of BIDDER <br />Title President <br />(if an individual, so state) <br />:' . <br />ent, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.