Laserfiche WebLink
Exhibit 2 <br />SURPLUS ALLOCATION DESCRIPTION <br />• ANGEL RESTROOM RENOVATION ($50,000) <br />o Angel Park restroom was installed approximately 40 years ago. The restroom is heavily <br />used and vandalized. Complete renovation is needed. Work will Included fixture <br />replacement, re- roofing, patching, vandal resistant doors, painting, etc. <br />• RIVERVIEW COURT AND PARKING LOT RENOVATION (96,200) <br />o The existing basketball court has large cracks, game lines are faded and court needs <br />complete resurfacing to avoid any potential injury. Similar situation is evident in the <br />parking lot. Project will include renovating both the parking lot and basketball court. <br />• SANTIAGO BIKE TRAIL RESURFACING PROJECT ($70,000) <br />o Tree roots have lifted various sections of the existing bike trail through Santiago Park. <br />Project will include section removal, root pruning and resurfacing to the bike trail. <br />• SANTIAGO PLAYGROUND EQUIPMENT REPLACEMENT ($230,000) <br />o Replacement parts are no longer available for the existing play equipment. As sections <br />of the play equipment wears out or gets vandalized, the area is blocked off or modified <br />with other parts. The play equipment will be replaced as part of this project. <br />• BOMO KORAL SIDEWALK /WALKWAY RENOVATION ($160,000) <br />o The existing concrete walkway and picnic area are lifting and cracking due to tree roots <br />and soil condition. Sections of the walkway and the entire picnic area will be removed <br />and replaced as part of this project. <br />• DAN YOUNG SOCCER FIELD #2 SYNTHETIC TURF REPLACEMENT ($640,000) <br />o The synthetic turf warranty on field #2 has expired. The field shows signs of extreme <br />wear. Sections of the synthetic turf have been patched several times and the GMAX <br />rating is below is below average. Project will include removal of the existing turf carpet <br />and replaced with a new carpet and additional rubber material. <br />• CABRILLO TENNIS COURT RENOVATION ($75,000) <br />o The existing tennis court on the east side of Cabrillo Park is not playable. Tree roots <br />have lifted sections of the court to make it unsafe to use. Project will include removal of <br />the court section and tree, new concrete surface, color coating, fence repair, and nets. <br />• WINDSOR TENNIS COURT ($140,000) <br />o The existing tennis court at Windsor Park is not playable. Tree roots have lifted sections <br />of the court to make it unsafe to use, Project will include removal of the court section <br />and tree, new concrete surface, color coating, fence repair, and nets. <br />• CIVIC CENTER JOINT POWERS AUTHORITY RENOVATION ($419,000) <br />o The Civic Center budget includes several projects that are managed by the County <br />and /or the City. The Civic Center Budget that was approved by the City Council required <br />the City and County to provide $820,000 each to balance the budget request. Funding is <br />needed for the city's share of the match. Projects include Renovation of Civic Center <br />Storm water lift stations, repair of lifted sidewalks, re- caulking to Plaza of the Fountains <br />and Plaza of the Flags, ADA Improvements by City Hall Council Chambers, <br />Courthouse /Library Parking Structure (Elevator modernization, generator replacement, <br />65A -7 <br />