My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE-2015
Clerk
>
Contracts / Agreements
>
A
>
AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2018 4:48:59 PM
Creation date
10/21/2015 10:31:33 AM
Metadata
Fields
Template:
Contracts
Company Name
AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE
Contract #
A-2015-203
Agency
PUBLIC WORKS
Council Approval Date
9/1/2015
Expiration Date
8/31/2018
Insurance Exp Date
7/1/2018
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment t <br />TABLE 4 <br />PART I — LIST OF KEY PERSONNEL <br />Names <br />Functions <br />• <br />Principal in Charge <br />Nathan Schaedlex <br />+ <br />As needed program assistance <br />• <br />Project manager/principal contact for the City <br />+ <br />Management of commercial/industrial inspections <br />Brent A. Smith <br />+ <br />Database manager <br />+ <br />As needed program assistance <br />+ <br />Assistant project manager/backup contact for the <br />City <br />Michael Lowther <br />+ <br />Management of commercial/industrial inspections <br />o <br />Senior NPDES Compliance Inspector <br />• <br />As needed program assistance <br />Michael Wallace <br />• <br />Database management support <br />Mahesh Nlcttu <br />• <br />Senior NPDES Compliance Inspector <br />Ellen Smith <br />+ <br />NPDES Compliance Inspector <br />Hairy Wilfong <br />+ <br />NPDBS Compliance Inspector <br />Kim Henry <br />• <br />NPDES Compliance Inspector <br />Ted Von Bimer <br />• <br />As needed program assistance <br />TABLE 5 <br />PART II — LIST OF SUECONSULTANT <br />Sub -Consultant Name / Address Functions <br />Amec Foster Wheeler will not use subconsultants to meet the requirements of this RFP. <br />Attachment 1 - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.