My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY - 2015
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 11:52:11 AM
Creation date
10/22/2015 1:04:30 PM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY
Contract #
A-2015-173
Agency
PUBLIC WORKS
Council Approval Date
8/4/2015
Expiration Date
8/4/2019
Insurance Exp Date
9/15/2017
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />CITY OF SANTA ANA <br />ON -CALL ENGINEERING SERVICES <br />I. DESCRIPTION OF WORK <br />The City of Santa Ana (City) solicited proposals from professional consulting firms (Consultant) to <br />provide engineering services on an on -call, as -needed basis. Engineering services may include civil <br />engineering, electrical engineering, traffic engineering, geotechnical, land/property surveying, structural, <br />stonn drain, water or sewer line -related engineering, architecture and landscaping design services and <br />grant writing services. Environmental and/or planning support services may also be requested. The <br />City may need consultant services for survey, mapping and legal description preparation, construction <br />management, staking and inspection or occasionally request mechanical, electrical and/or structural <br />services. The work, in general, consists of general engineering design projects on arterial and local <br />streets, bike paths, and public parks, citywide. The types of work efforts may include: <br />• Underground utility design/modifications; sidewalks, bike paths, curb and gutter replacement; slurry <br />seal of residential streets; repair and overlay of asphalt concrete and/or PCC streets; signing, striping, <br />neighborhood traffic studies, traffic signal modifications; landscaping and irrigation systems; park <br />and recreational design, grant application writing, building or facility work, other broader studies, <br />and other related projects as required. <br />• Amore detailed Scope of Work will be provided when/if a specific projector Task Order proposal is <br />requested of a consultant. <br />Funding sources will not include any state or federal funding. Projects for each project/task order shall <br />generally include local funds. Each project/task order assignment shall comply with any and all agency <br />funding requirements. The Sample Task Order was submitted with the proposal inclusive of the <br />hours, hourly rate and totals in Attachment C for the qualifications and value -based RFP . <br />Note, state prevailing wage requirements shall apply to work as required, and including but not limited <br />to, survey and materials testing work, and per the below link: <br />http://www.dir.ca.goy/publie-works/T-ublicworl(s.html) <br />Consultants and subconsultants completing any element of or type of work within projects/task orders <br />that is subject to compliance monitoring and enforcement by the State of California Department of <br />Industrial Relations, per Section 1771.4.a.1., shall inform themselves fully of conditions relating to <br />construction and labor law under which any work will be performed. Any consulting contract entered <br />into pursuant to this notice shall incorporate the provisions of the California State Labor Code wherever <br />they may apply and all fees shall be inclusive of or exceed these requirements. <br />City of Santa Ana Scope of Work <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.